Laserfiche WebLink
<br />i. Landscape concepts and plans for the 2nd St. Corridor from NP Ave. to <br />4th Ave. <br />j. Master Plan from Mickelson to 4th St. Levee. <br />2. Red River Levees - Phase 2 <br />a. 65 Percent Design Submittal <br />b. 95 Percent Design Submittal <br />c. Cost Estimates <br />d. Operation and Maintenance Plan <br />i. Draft Plan <br />ii. Final Plan <br />3. Red River Levees – VES reports <br />4. Support for Upstream Staging Area Levees <br />a. Oxbow/Hickson/Bakke TM <br />b. WP-43A <br />i. 35 Percent Design Submittal <br />ii. 65 Percent Design Submittal <br />iii. 95 Percent Design Submittal <br />iv. Cost Estimates <br />c. WP-43C <br />i. 35 Percent Design Submittal <br />ii. 65 Percent Design Submittal <br />iii. 95 Percent Design Submittal <br />iv. Cost Estimates <br />d. WP-43D <br />i. 35 Percent Design Submittal <br />ii. 65 Percent Design Submittal <br />iii. 95 Percent Design Submittal <br />iv. Cost Estimates <br />v. Operation and Maintenance Plan <br />1. Draft Plan <br />2. Final Plan <br />e. WP-43E <br />i. 35 Percent Design Submittal <br />ii. 65 Percent Design Submittal <br />iii. 95 Percent Design Submittal <br />iv. Cost Estimates <br />f. VES or VBDC reports <br />g. Comstock TM <br />h. Christine TM <br />i. Wolverton TM <br />j. Staging Area Non-Structural Improvements TM <br />iv. Work not included in this Scope of Services <br />1. Environmental permitting <br />2. Utility Relocation Agreements <br />3. ROW Acquisition including Appraisals, Title Searches, Title Opinions, Deeds <br />4. Bid documents and bidding services <br /> <br />HMG-TO-13-A4_Long.docx 12 <br />DR <br />A <br />F <br />T