<br />5. Wolverton – Ring Levee Evaluation: <br />a. Prepare a proposed ring levee system to reduce flood risk to <br />Wolverton, MN during operation of the Diversion Project and staging <br />of water. Show the location of a potential ring levee, develop height <br />required for rink levee, and evaluate access during periods of <br />Diversion operation. <br />6. Staging Area – Non-Structural Improvement Evaluation: <br />a. Identify individual residential properties within the staging area and <br />evaluate the potential benefit from non-structural improvements to <br />reduce flood risk to residential structures during operation of the <br />Diversion Project and staging of water. Show the location of potential <br />improvements and evaluate access during periods of Diversion <br />operation. <br />i. Provide mapping of residential structures and farmsteads <br />impacted by the Staging Area for the 100-year event, and <br />include estimated depth of impact for the structures with and <br />without the project. <br />ii. Where technically feasible, provide concept for non- <br />structural improvements and estimate cost of improvements. <br />iii. Develop database of impacted properties that includes <br />relevant project information (such as depth of impact with <br />and without project, etc.) <br />iv. Assist in preparation, provide meeting materials, and attend <br />one-on-one meetings with impacted landowners. <br />7. Assist with preparation of materials for public meetings. <br />iii. Deliverables <br />1. Red River Levees – Phase 1 <br />a. Project Schedule with milestone dates for key activities and monthly <br />updates <br />b. Monthly Progress Reports and meeting minutes <br />c. Alignment selection TM <br />d. Geotechnical TM, including: <br />- Geotechnical field and laboratory findings <br />- Geotechnical stability analysis <br />- Survey data <br />- Geotechnical field logs <br />e. Hydrologic and Hydraulic analysis TM <br />f. Transportation TM <br />g. Phase 1 Environmental Site Assessment reports <br />h. Preliminary Design Report, including: <br />- Preliminary pump sizing and storage needs <br />- Utility relocation requirements and issues <br />- Preliminary Levee design <br />- Preliminary Structural design <br />- Cost Estimate <br />- Preliminary Drawings <br />HMG-TO-13-A4_Long.docx 11 <br />DR <br />A <br />F <br />T