<br />technical specifications. Review adequacy of existing wastewater <br />pump station and forcemain for the 38 additional residential units. <br />i. Deliverables: <br />1. 35 Percent Design Submittal – prepare preliminary <br />design submittal and submit the design report and <br />preliminary plans for review by the Diversion <br />Authority, PMC, and USACE Consistency and ATR <br />review teams. <br />2. 65 Percent Design Submittal – evaluate and <br />incorporate accepted VE proposals into the design <br />documents, advance the detailed design to <br />65 percent and submit the design report, plans and <br />specifications for review by the Diversion Authority, <br />PMC, and USACE Consistency, ATR and IEPR review <br />teams. <br />3. 95 Percent Design Submittal – evaluate and <br />incorporate 65 percent review comments into the <br />design documents, advance the detailed design to <br />95 percent and submit the design report, plans and <br />specifications for review by the Diversion Authority, <br />PMC, and USACE Consistency and ATR review teams. <br />4. Cost Estimate – prepare cost estimates for the <br />project based on the 35 percent and 95 percent <br />submittal documents. <br />5. Bid Document Development – incorporate <br />95 percent review comments into the design <br />documents and assist the PMC with development of <br />bid documents. <br />h. VES or Value Based Design Charrette (VBDC) – facilitate a VES or VBDC <br />in accordance with USACE guidelines (up to 3 days) with staff from the <br />Diversion Authority, PMC, and USACE. Prepare and distribute <br />materials and documents, facilitate the workshop, and prepare a VES <br />report. <br />i. Coordinate and lead VES or VBDC of the five (5) O/H/B levee <br />design packages (WP-43A through WP-43E). <br />3. Comstock – Ring Levee Evaluation: <br />a. Prepare a proposed ring levee system to reduce flood risk to <br />Comstock, MN during operation of the Diversion Project and staging of <br />water. Show the location of a potential ring levee, develop height <br />required for rink levee, and evaluate access during periods of <br />Diversion operation. <br />4. Christine – Ring Levee Evaluation: <br />a. Prepare a proposed ring levee system to reduce flood risk to Christine, <br />ND during operation of the Diversion Project and staging of water. <br />Show the location of a potential ring levee, develop height required <br />for rink levee, and evaluate access during periods of Diversion <br />operation. <br />HMG-TO-13-A4_Long.docx 10 <br />DR <br />A <br />F <br />T