03-13-2014
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2014
>
03-13-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2014 3:14:18 PM
Creation date
11/28/2018 2:35:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />HMG_TO9‐A10_Long.docx 10 <br />III. Scope: <br />a. Assist Owner with developing a method of evaluating existing, planned, or potential <br />regional retention projects’ potential benefits to the Diversion Project. Scope to <br />include up to two (2) site evaluations. <br />b. Provide technical assistance to the RRBC in its study “Halstad Upstream Retention <br />(HUR) Modeling – Phase 1”. <br />IV. Deliverables <br />a. As requested. <br />H. PHASING PLAN INTERIM MODELING <br />I. Objective: Incorporate the Phase 1 and Phase 2 project features into the hydraulic <br />model, evaluate project benefits, and determine interim measures needed for a phased <br />project. <br />II. Background: The original project execution plan assumed unconstrained funding, an <br />approximate 8 year project schedule, and project design and construction starting on <br />the downstream (north) end of the project and progressing sequentially upstream. <br />Currently, it is anticipated that Federal funding will be constrained and, therefore, a <br />phased plan was developed to allow the project to proceed with limited Federal funding <br />and provide benefits as early as practical. This results in a three phased project. Phase <br />1 includes the Diversion Channel from the Outlet to downstream of the Maple River and <br />associated bridges, in‐town levees, and the Oxbow‐Hickson‐Bakke area levee. Phase 2 <br />includes the Red River and Wild Rice River control structures, the Staging Area <br />embankment, overflow embankment, tie‐back levee, the Diversion Inlet structure, <br />staging area land, associated bridges and transportation improvements, and associated <br />mitigation projects. Phase 3 includes the Diversion Channel from the Maple River to the <br />Diversion Inlet structure, associated bridges, the Maple River Aqueduct, the Sheyenne <br />River Aqueduct, and associated mitigation projects. <br />There may be a lag of several years between completion of Phases 1 and 2, and the <br />completion of Phase 3, and, therefore, modeling and evaluation is needed to 1) <br />determine project benefits and 2) the need for and extent of temporary measures <br />between phases of the project. <br />III. Scope: Perform 100‐year and 500‐year modeling evaluations of Phase 1 and Phase 2 <br />project components, quantify interim benefits, and determine what interim measures <br />are needed until completion of Phase 3. <br />IV. Deliverables: <br />a. Draft Technical Memorandum. <br />b. Final Technical Memorandum. <br />I. PHASE 7.1 MODEL UPDATE <br />I. Task 1 ‐ Update the Red River peak flow model geometry. Complete modeling for the <br />Red River peak flood events, including the 10‐, 2‐, 1‐, 0.2‐percent chance events and the <br />103kcfs and PMF flood events for both existing conditions and with‐project conditions. <br />Geometry updates include: <br />a. Update storage connections for the existing and with‐project model in the area <br />west of the diversion between the Maple River and the Sheyenne River. to better <br />reflect floodplain impacts and diversion side inlet sizing. <br />DR <br />A <br />F <br />T