Laserfiche WebLink
  <br />HMG_TO9‐A10_Long.docx  9  <br />ii. The study area is the area within the Risk Reduction Area that is affected  <br />by the flow coming across the Maple River Aqueduct.  <br />iii. Account for coincident flows on the Sheyenne River and other local drains  <br />and ditches.  <br />iv. Select Maple River design flows such that insurable structures in the Risk  <br />Reduction Area, and within the expected future 1% Maple River floodplain,  <br />are minimally affected by the Maple River design flows and the coincident  <br />flows on the Sheyenne River and the other local drains and ditches in the  <br />Risk Reduction Area.  <br />b) Establish Maple River design flows across the Maple River Aqueduct for the 1% and  <br />0.2% flood events.  <br />c) Recommend a maximum Maple River flow across the Maple River Aqueduct for the  <br />Standard Project Flood (SPF) event.  <br />Deliverables:  <br />a) Preliminary unsteady HEC‐RAS models.  <br />b) Final unsteady HEC‐RAS input and output files.  <br />c) 20‐year existing conditions model results.  <br />d) Final Technical Memorandum.  <br />IX. UPDATE HEC‐RAS MODELS – MAPLE RIVER AQUEDUCT AND REACH 6 BRIDGE  <br />a) Modify the unsteady‐flow HEC‐RAS model to reflect the lateral structure and  <br />spillway changes recommended by the Maple River aqueduct study team.  <br />b) Update the flow profile information (1% and 0.2% chance events, and 103,000 cfs  <br />event) needed for the bridge design effort, using the current Phase 7 unsteady‐flow  <br />HEC‐RAS model as the source of the geometry for the steady‐flow HEC‐RAS model.   <br />Continue to use the bridge design criteria provided in MFR‐005 (General Bridge Re‐ <br />Assessment for the Diversion from Inlet to Outlet) to determine the low‐chord  <br />elevation and hydraulic opening of bridges in the Diversion Channel.    <br />Deliverables:  <br />a) Draft Technical Memorandum.  <br />b) Final Technical Memorandum.  <br />X. WATER MONITORING GAGE SURVEYING  <br />a) Prepare and provide maps and coordinates of installation locations for 10 HOBO  <br />gages to USGS installation teams.  <br />b) After HOBO gages are installed, survey the elevations of the installed gages and  <br />provide survey data to USGS.  <br />  <br />Deliverables:  <br />a) Maps and coordinates of installation locations for 10 HOBO gages.  <br />b) Surveyed elevations of 10 HOBO gages.  <br />G. BASIN‐WIDE RETENTION SUPPORT  <br />I. Objective:  Assist Owner in supporting retention projects by others in the region.   <br />II. Background:  The Diversion Board has authorized up to $25 million for Basin‐wide  <br />Retention Projects that are compatible with, and provide benefits for, the Diversion  <br />Project. An initial study is underway by the Red River Basin Commission (RRBC).  <br />This subtask is not creditable by USACE.  <br />DR <br />A <br />F <br />T