Laserfiche WebLink
Bids were received for gasoline from the following: <br />Dan's Oil and Service <br />Farstad Oil, Inc. <br />Bids were received for asphalt products and for equipment rental <br />from the following: <br />Northern Improvement Company <br />F -M Asphalt, Inc. <br />Swanston Equipment Company <br />Christianson Asphalt Products <br />Triton Corporation of Jamestown <br />Bids were received for corrugated metal culverts from the <br />following: <br />BaTech, Inc. <br />Fargo Culvert Company <br />H.V. Johnston Culvert Company <br />Bids were received for concrete culverts from the following: <br />Hancock Concrete Products Company <br />North Dakota Concrete Products Company <br />Concrete Sectional Culvert Company <br />Bids were received for bridge materials from the following: <br />North Dakota Concrete Products Company <br />Wheeler Lumber Operations <br />BaTech, Inc. <br />Mrs. Stanton moved and Mr. Larson seconded to receive all of <br />the above bids and refer to the County Engineer and Road Department <br />for tabulation and recommendation. Motion carried. <br />Administrative Assistant Scott Krueger stated that Vernon <br />Solien, consulting engineer, reported that the roof of the Juvenile <br />Justice Center was designed to carry 100 pound live load, which is <br />more than adequate for a suggested solution to the problem of water <br />leaking into the building. The States Attorney will be consulted <br />on whether the County needs to advertise for bids for the project. <br />Mr. Larson suggested delaying the roof repair at this time because <br />adding more floors on the Juvenile Center may be a consideration for <br />the proposed combined law enforcement center. <br />Mrs. Stanton moved and Mr Larson seconded that the County Auditor <br />be authorized to pay the bill to Twin City Testing in the amount of <br />$975.00 for work in the Courthouse third floor law library. On roll <br />call vote, the motion carried unanimously. <br />