Laserfiche WebLink
Main Avenue MOU <br /> Pages of t3 <br /> October 20,2009 <br /> III'. SERVICE'ROADS <br /> SEGMENT 2—THE SHEYENNE R•WER TO 5"c STREET EAST, <br /> 1. Provide the 80.93%'federal funds for construction of frontage mad from the <br /> Sheyenne River to 5'Street East <br /> 2. . Pmt COnstructieri engineeting"services for all Work front the Sheyenne River. <br /> to 5th Street:East. <br /> The city of West Fargo: <br /> 1. Provide all of the 19.O %local match necessary fctr file.use of federal <br /> funds: <br /> 2. Maintain the roadway,to include: pavement markings,pedestrian crossings and <br /> markings,signs,curb and gutter,street:lighting,sign lighting,drainage, <br /> pavement maintenance,and snow plowing and snow removal. <br /> SEGMENT 3—S` STREET EAST TO 45Th STRL> ' <br /> 1. .; . Provide the 80.93%federal funds for construc tion of frontage road from 5t <br /> Street East to 45th Stet. <br /> 2. Provide construction engineering services for all work from 5th Street to 451 <br /> Street. <br /> The city of West Fargo: <br /> 1. Provide the 19.07%local match necessary for the use of federal funds. <br /> 2. Maintain the roadway,to include:pavement marking,.pedestrian crossings and <br /> markings,signs,curb and gutter,street lighting,sign lighting,drainage, <br /> pavement maintenance,and snow plowing and snow removal. <br /> IV. LANDSCAPING <br /> SEGMENTS 1,2&3—I-94 TO 45Th STREET <br /> NDDOT will: <br /> 1. Provide the 80.93%federal funds for construction of landscaping from I-94 to• <br /> 45th Street. <br />