Laserfiche WebLink
Main Avenue MOLT <br /> Page 4 of 8 <br /> October 20,2008 <br /> SEGMENT 2--THE SHEYENNE RIVER TO ea STREET EAST <br /> NT)DOT'will: <br /> 1. Provide the 80.93%federal funds for construction of multi-use trail from the <br /> Sheyenne River to 5`b Street East as shown i <br /> n: n red on the attached layout sheets. <br /> 2. Provide construction engineering services for all work from the Sheyenne River <br /> to°5th"Street East. <br /> The city of West Fargo.will: <br /> Provide all 19.07%local match for the use of federal aid for project work within <br /> the city limits as shown in the red on the attached layout sheets. <br /> 2. Maintain the multi-use path,to include:routine maintenance and snow plowing <br /> and snow removal from the Sheyenne River to 511 Street East,as shown in,the <br /> red on the attached layout sheets. <br /> SEGMENT 3—5'k STREET EAST TO 45m STREET <br /> NOS will: <br /> 1. Provide the 80.93%federal funds for construction of multi-use trail from 5th <br /> Street East to 45th Street. <br /> 2. Provide construction engineering services for all work from 5th Street East to 45th <br /> Street. <br /> The city of West Fargo will: <br /> 1. Provide all of the 19.07%local match limits as necessary for the use of federal <br /> aid for project work within the city limits as shown in the red on the attached <br /> layout sheets. <br /> 2: Maintain the multi-use path,to include:routine maintenance and snow plowing <br /> and snow removal from 5th Street East to 45th Street. <br />