2b. Road-cost partipcation agreement/Main Ave reconstruction
Laserfiche
>
Public
>
County Commission
>
2014
>
08-04-2014
>
Regular agenda
>
2b. Road-cost partipcation agreement/Main Ave reconstruction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2014 3:39:36 PM
Creation date
7/30/2014 12:57:15 PM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e' ... <br /> Main Avenue MOU <br /> Paga3 of 8 <br /> October 20,2008 <br /> The city of West Fargo will: <br /> 1. Provide the 10%local funds match as necessary for the use of federal aid for <br /> project work within the city limits as shown in yellow on the attached layout <br /> sheets. This cost will include the`'actual construction cost plus 10%for the <br /> preliminary and construction engineering;and will pay 100%of the construction <br /> costs plus 10%for the preliminary and construction engineering of all items not <br /> eligible for federal aid participation. <br /> 2. Maintain the roadway and sidewalk,to include:pavement markings,pedestrian. <br /> crossings and markings,signs,curb and gutter,street lighting sign lighting, <br /> drainage,pavement maintenance,snow plowing and snow removal,and traffic <br /> signals. <br /> II. Multi-Use Trail <br /> SEGMENT 1—I-94 TO THE SHEYENNE RIVER <br /> NDDOT will: <br /> 1. Provide the 80.93%federal funds for construction of multi-use trail from 1-94 to <br /> the Sheyenne River. <br /> 2; Provide construction engineering services for all work from 1-94 Interchange to <br /> the Sheyenne River. <br /> The county of Cass will: <br /> 1. Provide all of the 19.07%local match limits as necessary for the use of federal <br /> aid for project work within the county from 1-94 to 11th Street West, as shown in <br /> green on the attached layout sheets. <br /> 2. Maintain the multi-use trail,to include:routine maintenance and snow plowing <br /> and snow removal from 1-94 to 1 lt'Street West,as shown in green on the <br /> attached layout sheets. <br /> The city of West Fargo will: <br /> I. Provide the 19.07%local match for the use of federal aid for project work within <br /> the city from 11th Street West to the Sheyenne River,as shown in red on the <br /> attached layout sheets. <br /> 2. Maintain the multi-use path,to include:routine maintenance and snow plowing <br /> and snow removal from I-94 to 11th Street West to the Sheyenne River,as shown <br /> in red on the attached layout sheets. <br />
The URL can be used to link to this page
Your browser does not support the video tag.