Laserfiche WebLink
J... <br /> Main Avenue MOU <br /> Page 2 of 8 <br /> October 20,2008 <br /> 2. Maintain the roadway and sidewalk,to include:pavement markings,pedestrian <br /> crossings and markings, signs,curb and gutter,street lighting,sign lighting, <br /> . pavement maintenance,snow plowing and snow removal,and traffic <br /> Vie,P p . .. <br /> signals. .. <br /> SEGMENT 2—THE SHEYENNE RIVER TO 5111 STREET EAST <br /> NDDOT will: _ <br /> 1. Provide 80.93%federal funds and 9.07%state funds for construction of Main <br /> Avenue mainline from the Sheyenne River to 51h Street East,shown in yellow on <br /> the attached layout sheets. <br /> 2. Provide construction engineering services for all federal aid funded work from <br /> the Sheyenne River to 5 Street East. <br /> The city of West Fargo will: <br /> 1. Provide the 10%local funds match as necessary for the use of federal aid for. <br /> project work within the city limits as shown in yellow on the attached layout <br /> sheets .This total cost will include the actual construction cost plus 10%for the <br /> prey uYni iary and construction engineering and will pay-100%of the construction <br /> costs'plus 10°4 for the,proelimin r and construction engineering rg of all is not <br /> eligible for federal aid participation. <br /> 2. Maintain the roadway and sidewalk,to include:pavement markings,pedestrian <br /> crossings and markings,signs,curb and gutter,street lighting,sign lighting, <br /> drainage,pavement maintenance,snowplowing and snow removal,and traffic <br /> signals. <br /> 3. Provide all maintenance for the Sheyenne River structure East of 5th Street West <br /> on Main Avenue. <br /> SEGMENT 3—eh STREET EAST TO 45Th STREET EAST <br /> NDDOT will: <br /> I. Provide 80.93%federal funds and 9.07%state funds for construction of Main <br /> Avenue mainline from 5th Street to 45th Street. <br /> 2. Provide construction engineering services for all federal aid funded work from <br /> 1-94 Interchange to 45th Street. <br />