2b. Road-cost partipcation agreement/Main Ave reconstruction
Laserfiche
>
Public
>
County Commission
>
2014
>
08-04-2014
>
Regular agenda
>
2b. Road-cost partipcation agreement/Main Ave reconstruction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2014 3:39:36 PM
Creation date
7/30/2014 12:57:15 PM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J... <br /> Main Avenue MOU <br /> Page 2 of 8 <br /> October 20,2008 <br /> 2. Maintain the roadway and sidewalk,to include:pavement markings,pedestrian <br /> crossings and markings, signs,curb and gutter,street lighting,sign lighting, <br /> . pavement maintenance,snow plowing and snow removal,and traffic <br /> Vie,P p . .. <br /> signals. .. <br /> SEGMENT 2—THE SHEYENNE RIVER TO 5111 STREET EAST <br /> NDDOT will: _ <br /> 1. Provide 80.93%federal funds and 9.07%state funds for construction of Main <br /> Avenue mainline from the Sheyenne River to 51h Street East,shown in yellow on <br /> the attached layout sheets. <br /> 2. Provide construction engineering services for all federal aid funded work from <br /> the Sheyenne River to 5 Street East. <br /> The city of West Fargo will: <br /> 1. Provide the 10%local funds match as necessary for the use of federal aid for. <br /> project work within the city limits as shown in yellow on the attached layout <br /> sheets .This total cost will include the actual construction cost plus 10%for the <br /> prey uYni iary and construction engineering and will pay-100%of the construction <br /> costs'plus 10°4 for the,proelimin r and construction engineering rg of all is not <br /> eligible for federal aid participation. <br /> 2. Maintain the roadway and sidewalk,to include:pavement markings,pedestrian <br /> crossings and markings,signs,curb and gutter,street lighting,sign lighting, <br /> drainage,pavement maintenance,snowplowing and snow removal,and traffic <br /> signals. <br /> 3. Provide all maintenance for the Sheyenne River structure East of 5th Street West <br /> on Main Avenue. <br /> SEGMENT 3—eh STREET EAST TO 45Th STREET EAST <br /> NDDOT will: <br /> I. Provide 80.93%federal funds and 9.07%state funds for construction of Main <br /> Avenue mainline from 5th Street to 45th Street. <br /> 2. Provide construction engineering services for all federal aid funded work from <br /> 1-94 Interchange to 45th Street. <br />
The URL can be used to link to this page
Your browser does not support the video tag.