2024-04-16
Laserfiche
>
Public
>
Water Resource Districts
>
Rush River
>
Minutes
>
2024
>
2024-04-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2024 1:48:11 PM
Creation date
5/21/2024 1:48:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br />MINUTES OF VIRTUAL / CONFERENCE CALL SPECIAL MEETING <br />RUSH RIVER WATER RESOURCE DISTRICT <br />ORIGINATING AT THE CASS COUNTY HIGHWAY DEPARTMENT <br />HERITAGE CONFERENCE ROOM <br />WEST FARGO, NORTH DAKOTA <br />APRIL 16, 2024 <br />9:00 A.M. <br /> <br />A virtual / conference call special meeting of the Rush River Water Resource District was <br />held on April 16, 2024, at 9:00 a.m. <br /> <br />Present were William A. Hejl, Chairman; Richard Sundberg, Manager; Jacob Gust, <br />Manager; Melissa Hinkemeyer, Secretary-Treasurer; Leilei Bao, Accountant; Carolyn <br />Fiechtner, Administrative Assistant; Sean M. Fredricks, Ohnstad Twichell, P.C.; Alexa <br />Ducioame, Moore Engineering, Inc.; Mike Opat, Houston Engineering, Inc.; Duane <br />Breitling, Cass County Commissioner; Kyle Litchy, Cass County Highway Department; <br />Jim Krogh, Raymond Township property owner; and Dylan Foss, Harwood. <br /> <br />Approval of agenda <br />It was moved by Manager Sundberg and seconded by Manager Gust to approve the order <br />of the agenda, as presented. Upon roll call vote, the motion carried unanimously. <br /> <br />Minutes <br />It was moved by Manager Sundberg and seconded by Manager Gust to approve the <br />minutes of the March 19, 2024, meeting, as presented. Upon roll call vote, the motion <br />carried unanimously. <br /> <br />Metro Flood Diversion Project <br />Chairman Hejl and Manager Gust reported on construction updates of various <br />components of the Metro Flood Diversion Project. <br /> <br />Alexa Ducioame stated Moore Engineering, Inc. is modeling the transition between the <br />Rush River and the Diversion Channel of the Metro Flood Diversion Project to ensure the <br />flow velocities are acceptable. <br /> <br />Jim Krogh and Dylan Foss addressed the Board with concerns regarding drainage in <br />Sections 36 and 25 of Berlin Township and Section 2 of Raymond Township, on the west <br />side of the Diversion Channel. Mr. Krogh and Mr. Foss proposed a temporary tie-in from <br />the west side of the Diversion Channel to the Rush River instead of the current pump <br />system. <br /> <br />The contact information for the engineers at Moore Engineering, Inc. and the Director of <br />Engineering at the Diversion Authority was provided. The Board noted that if Mr. Krogh
The URL can be used to link to this page
Your browser does not support the video tag.