Laserfiche WebLink
<br /> <br />EJ'w ~,'I., + Q <br />moore engineering, inc. <br /> <br />1042 14th Ave. E. West Fargo. North Dakota 58078 . Phone: 701-282-4692 . Fax: 701-282-4530 <br /> <br />August 1, 2003 <br /> <br />John and Mary Swartz <br />4802 57th Street North <br />Harwood, NO 58042 <br /> <br />Re: LeMA I LOMR <br /> <br />Dear Mr. & MIS. Swartz: <br /> <br />Per your requestl following is a proposal to provide the engineering services necessary to complete <br />the application process to request FEMA remove your house from the floodway by a Letter of Map <br />Amendment (LOMA) or by a Letter of Map Revision (LOMR). . <br /> <br />As we discussed recently, the request for a laMA will require less information and could get through <br />a FEMA review quicker than a lOMR however, it may not remove more than the structure (house) <br />from the fIoodway. YoU should verify with the City of Fargo if you win be able to attach a new garage <br />to the house with a laMA for the house if you choose this method. <br /> <br />The request for a lOMR will require a technical analysis of the floodway and win result in a more <br />detailed submittal than a LeMA. however if successful it could remove your house and some of the <br />surrounding property from the floodway. This would give you more flexibility to do other things to <br />your property in the future. With this submittal, we would request the floodway be modified as shown <br />on the sketch we sent you earlier. <br /> <br />As I had indicated to your attorney earlier, we intend to work cooperatively with you to get this matter <br />completed. To prepare the FEMA submittal package for you, we propose to complete the work on an <br />hourly basis with the following maximum fee. <br />LeMA submittal- Maximum fee - $ 1,000 <br />Estimated cost to prepare the submittal - $ 1,500 to $ 2.000. <br />LOMR submittal - Maximum fee - $ 3,000 <br />Estimated cost to prepare the submittal - $ 4,500 to $ 5,000. <br /> <br />If this proposal is acceptable to you, please indicate which option you wish to proceed with, sign and <br />return this proposal to me. We will require a 50% deposit before work will begin. The remaining 50% <br />win be due when the package is completed for submittal to FEMA. If you have any questions, please <br />do not hesitate to contact me. <br /> <br /> <br />CHAMBER <br /><II <br /> <br />~ Farza MœrIaI ...of <br />'0 8tIsi~ ~ ~ <br /> <br /> <br />Acceptance: <br /> <br />laMA <br /> <br />LOMR <br /> <br />Cc: Lynn Bnlz ' <br /> <br />('.(')1"\.<;1 dtinn ¡::nnlnAA~ nnrl I nnrl ~lln/AVI"'lr!; <br />