3b. Road Dept-Wild Rice River bridge repairs
Laserfiche
>
Public
>
County Commission
>
2008
>
12-15-2008
>
Regular agenda
>
3b. Road Dept-Wild Rice River bridge repairs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2008 1:59:45 PM
Creation date
12/9/2008 11:04:00 AM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Dec.15.2008 2:45PM <br /> <br />Cass County HighwaY Dept. <br /> <br />No.2948 p. 3/3 <br /> <br />'1~ 'B~, '11ft!,. <br /> <br />. <br /> <br />~l.. <br /> <br />W.B. DIEDeRICH. CH.-JA~ OF THE Bo.Ulo <br />~L W. DIEDERICH. PAUIDEHT <br /> <br />(;.".1'fI1 CO'-'HleI.,. <br /> <br />JIIII' u. <br /> <br />PHON~ 1OtIll2...77 FAX 7ot{l!'t.1~" <br />P.O. BOX 406 FARGO. NORTH DAKOTA 68101-0406 <br /> <br />December 1 Slh 2008 <br /> <br />Prank podolJ <br />Cau County Highway Department <br />1201 Main Ave.nue West <br />weSt Fatgri,ND 58078 <br /> <br />Re: Solberg Bridge Repair <br /> <br />Dear Mr. Podoll, <br /> <br />Industrial Builders, Inc. is pleased to quote the repair of the Solberg Bridge, located south of Wild Rice for <br />the lump sum of$27,93S.00. Also, IBI will ret'QQye the debris on the east side of the structure and stock pile <br />at the top oftbe river bank, on the sam'e mob as the other work, (or an additional $~SOO.OO LS. This <br />quotation includes; <br />· Mobilization of a personnel and equipment. <br />· Removal of plank and hoist off south approach span and reset center .span. <br />· Reposition existing S. abutment cap on timber piles mid re-ilttach. <br />· Trim south span to fit b~ck into position artd reset. <br />· Use on site dirt to fill in wash out behind .N. abutment. Resurface with a load Qt two of gravel. <br /> <br />Conditions; <br />· Excludes any major OIl;lterials, <br />. Traffic C9ntrolby others. <br />· Reseed all s~te disturbanoes as necessary. <br />· Bond not included. <br /> <br />Note that.it is the opiniOI) of J ndustrial Builders, Inc. thai there is .'substaJlti.1 amount of additil;lI1al work needed to make tbe <br />bridge a Ian, jUucture. For instanc~. the stringers on Ihe south approach appear to be rotten end the piling on the 80uth abutment <br />III'e pushed in and broken. <br /> <br />We appreciate the opportunity to quote you on this work. Please let me know if you have any further <br />questions. <br /> <br />Sincerely, <br />In;Stria . <br /> <br />~~.J: <br /> <br /> <br />co: project tile 14518 <br /> <br />'NIl ~.. .n hUll Oppo/I_ h1plOVIf Mr'^,1H <br />
The URL can be used to link to this page
Your browser does not support the video tag.