2. Road Dept-budget adjustment
Laserfiche
>
Public
>
County Commission
>
2008
>
10-06-2008
>
Regular agenda
>
2. Road Dept-budget adjustment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2008 11:45:36 AM
Creation date
9/30/2008 11:45:20 AM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Concrete: The original quantity estimates had considered building the entire project with <br />asphalt. Prior to construction, I changed two project areas to use concrete instead of <br />asphalt. These areas were the old part of Horace and the roundabout area. This will <br />result in a better overall value in these permanent portions of the project. At the time I <br />decided to use concrete in these areas I also revised the asphalt mix design to use a <br />Minnesota DOT specification that takes advantage some recycle asphalt at a cost savings. <br />The net result of the two changes was that we could do concrete for about $100,000 more <br />than asphalt. <br /> <br />Right of Way Acquisition: This exceeded the May projection by about $200,000. <br /> <br />Demolition: Earlier estimates had not accounted for demolition costs of buildings. <br />We've had to demolish 5 grain bins, a barn, storage shed, house and garage. (Have not <br />yet bid house and garage demo) <br />
The URL can be used to link to this page
Your browser does not support the video tag.