Laserfiche WebLink
<br />1997 -2005 <br />Average <br />$12,164 <br /> <br />1997 <br />$12.000 <br /> <br />1998 <br />$14.400 <br /> <br />1999 <br />$13.450 <br /> <br />2000 <br />$12.309 <br /> <br />2001 <br />7 <br /> <br />Road Report <br /> <br />2002 <br />$11.267 <br /> <br />2003 <br />$11.418 <br /> <br />Harmony Township Beet <br /> <br />2004 <br />$13.099 <br /> <br />2005 <br />$13.168 <br /> <br />2006 <br />$13.000 <br /> <br />2007 <br />$14.000 <br /> <br />2008 <br />Estimate <br />$14.000 <br /> <br />Income <br />Beet Growers <br /> <br />,688 <br /> <br />1,250 <br />7.85 <br />$9,813 <br /> <br />2,850 <br />7.85 <br />$22,373 <br /> <br />,600 <br />7.85 <br />$12,560 <br /> <br />,650 <br />7.85 <br />$12,953 <br /> <br />2,000 <br />8.15 <br />$16,300 <br /> <br />1,304 <br />8.15 <br />$10,628 <br /> <br />,560 <br />8.65 <br />$13,494 <br /> <br />1,560 <br />8.65 <br />$13,494 <br /> <br />1 ,420 <br />9.40 <br />$13.348 <br /> <br />1,860 <br />10.00 <br />$18,600 <br /> <br />1 ,460 <br />12.00 <br />$17,520 <br /> <br />1,600 <br />15.00 <br />$24,000 <br /> <br />Expenses <br />Gravel <br />9 miles Total Yards <br />Cost/Yard <br /> <br />$13,885 <br /> <br />$50/h r <br />o <br />2,880 <br />o <br />$2,880 <br /> <br />$50/hr <br />1,073 <br />o <br />2,953 <br />$4.025 <br /> <br />$50/hr <br />1 ,485 <br />2,338 <br />908 <br />$4,730 <br /> <br />$50/hr <br />660 <br />2,173 <br />o <br />$2,833 <br /> <br />$50/hr <br />o <br />3,150 <br />488 <br />$3,638 <br /> <br />$50/hr <br />225 <br />4,425 <br />825 <br />$5,475 <br /> <br />$50/hr <br />1,675 <br />4,025 <br />1 ,425 <br />$7,125 <br /> <br />$50/hr <br />950 <br />3,675 <br />1,075 <br />$5,700 <br /> <br />$50/hr <br />1,000 <br />4,075 <br />1,225 <br />$6,300 <br /> <br />$50/hr <br />2,000 <br />6,475 <br />3,100 <br />$11 ,575 <br /> <br />$50/hr <br />1,900 <br />7,075 <br />2,850 <br />$11,825 <br /> <br />$75/hr <br />2,850 <br />10,613 <br />4,275 <br />$17,738 <br /> <br />Grader <br />September <br />October <br />November <br /> <br /> <br /> <br />Grader Snow Removal <br />January <br /> <br /> <br />*** <br /> <br />o <br /> <br />.... <br /> <br />o <br /> <br />Total snow Removal <br /> <br />Chloride (7 Farm sites) <br /> <br />TotafSXpenses <br /> <br />Extra Road Repairs <br /> <br />*** Note: there was snow removal and extra road repairs over the years, but didn't take the time <br />to look up. Also in some years, farmers (some non beet growers) blew snow at their own expense. <br /> <br />needed <br /> <br />roads In our township are graveled every other year except these 9 miles <br /> <br />All 9 miles are shot!!! As the roads get pounded down and widened the more gravel, grading and snow removal is <br />The roads are field level. Five of the 9 miles are 35+ feet wide and 200 yards of gravel per mile is awfully thin <br /> <br />gravel <br /> <br />Most <br /> <br />the extra expenses are <br /> <br />(1997 - 2005) was $6,465 which we could easily handle, since 2006 <br />township is at the breaking point and cannot continue this way. <br /> <br />Average loss for 9 years <br />beyond our means. The <br /> <br />Problems that need to be addressed <br />1. Reimbursement for years 2006 & 2007 <br />2. What to do for 2008 and beyond <br />3. Funds for rebuilding the roads. <br />