Laserfiche WebLink
<br />B. FINAL TREATMENT AND DISPOSAL <br /> <br />1. General - Final treatment and disposal of all sewage tank <br />effluent shall be approved by the Health Officer or designated <br />Health Officer. <br /> <br />Standard System <br /> <br />a. Sizing <br /> <br />1. The required soil treatment area shall be <br />determined by number of bedrooms for <br />dwellings, the sum of the areas required for <br />each individual unit for multiple residential <br />units, and by the daily sewage flow for other <br />establishments. <br /> <br />2. The minimum soil treatment area required for <br />any dwelling shall provide at least 2 <br />bedrooms. <br /> <br />3. Estimates of sewage flow for dwellings are <br />given in Table III. <br /> <br />TABLE III <br /> <br />Number of Sewage Flow <br />Bedrooms (Gallons per Day) <br />2 300 <br />3 450 <br />4 600 <br />5 750 <br />6 900 <br /> <br />4. The soil treatment area shall be at least as <br />large as set forth in Table IV. <br /> <br />29 <br />