i. Septic system permit fees--Fargo Cass Public Health
Laserfiche
>
Public
>
County Commission
>
2008
>
04-07-2008
>
Consent agenda
>
i. Septic system permit fees--Fargo Cass Public Health
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2008 12:42:09 PM
Creation date
4/1/2008 12:41:04 PM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />5. If the dosing device is a pump, it shall be <br />cast iron or bronze fitted and with stainless <br />steel screws or constructed of other sound, <br />durable and corrosion-resistant materials. <br /> <br />6. Where the soil treatment area is at a higher <br />elevation than the pump, sufficient dynamic <br />head shall be provided for both the elevation <br />difference and friction loss. <br /> <br />c. Dosing devices for pressure distribution <br /> <br />1. The dosing device shall be a pump which is <br />cast iron or bronze fitted and with stainless <br />steel screws or constructed of sound, <br />durable and corrosion resistant materials. <br /> <br />2. The pump discharge capacity shall be at <br />least 30 gallons per minute for a 3 bedroom <br />or smaller dwelling and an additional 10 <br />gallons per minute for each bedroom above <br />three. For other establishments, the pump <br />discharge shall be 10 gallons per minute of <br />each 200 gallons per day of sewage flow or <br />30 gallons per minute, whichever is greater. <br /> <br />3. The pump discharge head shall be at least 5 <br />feet greater than the head required to <br />overcome pipe friction losses and the <br />elevation difference between the pump and <br />the distribution device. <br /> <br />4. The quantity of effluent delivered for each <br />pump cycle shall be equal to 25% of one <br />day's sewage flow or 100 gallons, whichever <br />is greater. <br /> <br />5. An alarm device shall be installed to warn of <br />pump failure. <br /> <br />28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.