2b. Harwood bike & pedestrian path-comment letter
Laserfiche
>
Public
>
County Commission
>
2008
>
01-22-2008
>
Regular agenda
>
2b. Harwood bike & pedestrian path-comment letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2008 7:58:01 AM
Creation date
1/16/2008 7:45:45 AM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Harwood Pedestrian and Bicycle Crossing Study - 2007 <br /> <br />Table A.23: Cost Estimation for Implementing Alternative 3 <br /> <br />SI# Item Units Quantity Approximate unit price Total <br />I Mobilization LS 3 $10,000 $30,000 <br />2 Contract Bond LS 3 $3,000 $9,000 <br />3 Removals LS 3 $1,000 $3,000 <br />4 Common Excavation CY 2200 $12 $26,400 <br />5 Seeding Acre 2 $3,200 $6,400 <br />6 Traffic Control LS 3 $1,000 $3,000 <br />7 Aggregate Base Ton 550 $12 $6,600 <br />8 Culverts LS I $5,000 $5,000 <br />9 Caution Beacons LS 2 $15,000 $30,000 <br />10 Ladder Crosswalk LS 2 $300 $600 <br />II Standard Crosswalk LS 4 $100 $400 <br />12 Signing LS 2 $1,000 $2,000 <br />13 Concrete path SY 600 $32 $19,200 <br />14 Concrete path I 0'X5' - 950' SY 1055 $32 $33,760 <br />15 Concrete path IO'X5' -1060' SY 1180 $32 $37,760 <br />16 Jersey Barrier LF 300 $350 $105,000 <br />17 W-Beam Guardrail (4 corners) LF 225 $30 $6,750 <br />18 Trees LS I $5,000 $5,000 <br /> Sub Total $329,870 <br /> Contingency $30,787 <br /> Construction Engineering $30,787 <br /> Total $391,444 <br /> <br />Table A.24: Cost Estimation for Implementing Alternative 4 <br />Considering the cost of a standard bridge deck widening to be $130/sq ft., the <br />approximate total estimated cost of a stand alone bridge is 4224 sq ft X $130 = $549,120. <br /> <br />SI# Item Units Quantity Approximate unit price Total <br />I Mobilization LS 3 $10 000 $30 000 <br />2 Contract Bond LS 3 $3 000 $9 000 <br />3 Removals LS 3 $1000 $3 000 <br />4 Common Excavation CY 2200 $12 $26 400 <br />5 Seeding Acre 2 $3 200 $6 400 <br />6 Traffic Control LS 3 $1000 $3 000 <br />7 Aggregate Base Ton 550 $12 $6 600 <br />9 Caution Beacons LS 2 $15 000 $30 000 <br />10 Signing LS 2 $1000 $2 000 <br />II Deck LS I $549 120 $549 120 <br />12 Concrete path 10'X5' -1060' SY 1180 $32 $37 760 <br />I3 Jersev Barrier LF 300 $350 $105000 <br />14 W-Beam Guardrail (4 corners) LF 225 $30 $6 750 <br />15 Ladder Crosswalk LS 2 $300 $600 <br />16 Standard Crosswalk LS 4 $100 $400 <br /> Sub Total $816,030 <br /> Contingency $30,787 <br /> Construction Engineering $30,787 <br /> Total $877,604 <br /> <br />Fargo - Moorhead Metropolitan Council of Governments <br /> <br />- 27 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.