Laserfiche WebLink
<br />Harwood Pedestrian and Bicycle Crossing Study - 2007 <br /> <br />A.2 Cost Estimation <br /> <br />The following cost estimates are rough estimates based on the conceptual drawings and <br />may vary with the actual engineering design. <br /> <br />Table A.21: Cost Estimation for Implementing Alternative 1 <br /> <br />SI# Item Units Quantity Approximate unit price Total <br />1 Mobilization LS 1 $10 000 $10 000 <br />2 Contract Bond LS 1 $3,000 $3.000 <br />3 Removals LS I $1.000 $1000 <br />4 Common Excavation CY 200 $12 $2,400 <br />5 Seeding Acre 0.2 $3.200 $640 <br />6 Traffic Control LS I $1000 $1000 <br />7 Aggregate Base Ton 125 $12 $1500 <br />8 Caution Beacons LS 2 $15,000 $30 000 <br />9 Ladder Crosswalk LS 2 $300 $600 <br />10 Standard Crosswalk LS 4 $100 $400 <br />II Bike/Ped Signage LS 2 $150 $300 <br />12 Concrete path SY 600 $32 $19 200 <br /> Sub Total $70 040 <br /> Contingency $30,787 <br /> Construction Engineering $30,787 <br /> Total $131,614 <br /> <br />Table A.22: Cost Estimation for Implementing Alternative 2 <br /> <br />SI# Item Units Quantity Approximate unit price Total <br />1 Mobilization LS 2 $10 000 $20 000 <br />2 Contract Bond LS 2 $3 000 $6 000 <br />3 Removals LS 2 $1000 $2 000 <br />4 Common Excavation CY 1200 $12 $14 400 <br />5 Seeding Acre 1 $3 200 $3 200 <br />6 Traffic Control LS 2 $1 000 $2 000 <br />7 Aggregate Base Ton 325 $12 $3 900 <br />8 Culverts LS I $5 000 $5 000 <br />9 Caution Beacons LS 2 $15 000 $30 000 <br />10 Ladder Crosswalk LS 2 $300 $600 <br />11 Standard Crosswalk LS 4 $100 $400 <br />12 Signing LS 2 $1000 $2 000 <br />13 Concrete oath SY 600 $32 $19 200 <br />14 Concrete path 10'X5' - 950' SY 1055 $32 $33 760 <br />15 Trees LS 1 $5 000 $5 000 <br /> Sub Total $147,460 <br /> Contingency $30,787 <br /> Construction Engineering $30,787 <br /> Total $209,034 <br /> <br />Fargo - Moorhead Metropolitan Council of Governments <br /> <br />- 26 - <br />