Laserfiche WebLink
<br />[])~[?u <br />@W@[? [Q)OCFLfiJ@Ol)@O@)Ol) ~@~o:oD@~o@)Ol)@ <br /> <br />Summary of Changes <br /> <br />Changed Table on Page 4 of 23 <br /> <br />"Road Restriction Reduction in Weights" to reflect new classes and axle weights. <br />Class A = 8 Ton; Class 1 = 7 Ton; Class 2 = 6 Ton; Class 3 = 5 Ton <br /> <br />Changed Tables on Page 13 throuah 20 of 23 <br /> <br />GVW Table: <br />Unrestricted- Remains same <br />8 Ton- Remains same as old Class A <br />7 Ton- Moved fee start from 92,000 to 106,000 <br />6 Ton- Moved fee start from 66,000 to 82,000 <br />The point where fee scale changes from $5 increase to $10 increase per 2,000 Ibs <br />remains at approx. 200,000 Ibs. GVW (same as existing policy). <br /> <br />Axle Tables: <br />Unrestricted- Remains same <br />All other Classes moved start of fee scale to reflect new maximums for single, tandem, <br />triple, quad, and 5-axle groups as needed. <br /> <br />Self Propelled Earthmoving Equipment on Page 21 of 23 <br /> <br />Unrestricted- Remains same <br />8 Ton- Remains same as old Class A <br />7 Ton- Moved fee start from 33,000 to 30,000 <br />6 Ton- Remains same as old Class 2 <br />