i. Contract approval
Laserfiche
>
Public
>
County Commission
>
2008
>
01-07-2008
>
Consent agenda
>
i. Contract approval
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2008 7:46:41 AM
Creation date
1/2/2008 9:38:03 AM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. ORIGINAL PLANS AND PRINTS <br /> <br />One set of plans shall be provided for use in making a P.S.& E. Inspection. Prints of plan sheets necessary for use by <br />utility companies to provide estimates and agreements for relocation work shall be provided. <br /> <br />After all P.S.& E comments have been resolved and corrections made, the original copy of the final plans shall be <br />furnished to the county or the North Dakota Department ofTransportation(department). <br /> <br />G.RIGHT OF WAY PLATS <br /> <br />NONE: (County responsibility). <br /> <br />H. ADDITIONAL WORK ITEMS OR EXCEPTIONS <br /> <br />Services as outlined in the Houston Engineering letter of December 14,2007. WORK TO INCLUDE <br />DETERMINATION OF ANY UTILITY CONFLICTS AND ACQUISITION OF REQUIRED UTILITY <br />RELOCATION PERMITS. <br /> <br />(If a cultural resource survey and report is required, work and cost will be included in a supplemental agreement <br />prior to the work being done.) <br /> <br />II. <br /> <br />The engineer or representative shall participate in and infonn the county of the P.S.& E. or T.S.& L. inspection, or <br />any special conference or special field inspection during the progress of the design. The engineer shall also keep the <br />county informed of project development. There shall be no additional compensation to the engineer tor this work. <br /> <br />III. <br /> <br />The tinal plans, Special Requirements, and Cost Estimate shall be prepared and submitted to the county in <br />accordance with your letter dated December 14,2007, following approval of this agreement. Reasonable extension <br />of time, necessitated by the unavoidable delays, may be made when mutually agreed to in writing by the parties to <br />this agreement. <br /> <br />IV. <br /> <br />The county will pay the engineer $12.275.00 (lump sum) for the above specified services. The fee shall not <br />exceed $12.275.00 for the project unless changed according to Section VB. A breakdown of cost is attached. <br /> <br />V. <br /> <br />All plans shall become property ofthe county. <br /> <br />VI. <br /> <br />Duly authorized representatives of the county, department, and Federal Highway Administration (FHW A) shall have <br />right to inspect and copy the engineer's plans, tiles, and records relating to the work included in this agreement. <br /> <br />All books, documents, papers, accounting records, and other evidence pertaining to the cost incurred under the <br />agreement shall be retained by the engineer and available for inspection by the county, department, or FHW A for a <br />period of three years after the date of final payment. <br /> <br />The files and records shall be available in the engineer's office located at 2505 N. University Drive, Fargo, ND <br />58105. <br /> <br />J:\^dmin-Eng\PROJECTS\C I 0 Tumlancs C23 North End\CorrespondcnccIEngin. Agrccmcnl.Houston Eng CION End of C'23.doc <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.