3. Road Dept-grant applications for Harwood, Mapleton
Laserfiche
>
Public
>
County Commission
>
2007
>
10-01-2007
>
Regular agenda
>
3. Road Dept-grant applications for Harwood, Mapleton
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2007 9:05:20 AM
Creation date
9/26/2007 8:05:59 AM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CASSCOUNlY <br />GOVERNMENT <br /> <br />..I.. <br /> <br />Highway <br />Department <br /> <br />Keith D. Berndt, P.E. <br />County Engineer <br /> <br />Richard S. Sieg <br />Superintendent <br /> <br />Thomas B. Soucy, P.E. <br />Design and Construction <br />Supervisor <br /> <br />1201 Main Avenue West <br />West Fargo, North Dakota <br />58078-1301 <br /> <br />701-298-2370 <br />Fax 701-298-2395 <br /> <br />RECEIVED <br /> <br />MEMORANDUM <br /> <br />SEP 2 1 2007 <br /> <br />TO: <br /> <br />Cass County Commission <br /> <br />Keith Berndt, Cass County Engineer~ <br /> <br />CASS COUNTY COMMISSION <br /> <br />FROM: <br /> <br />DATE: <br /> <br />September 20,2007 <br /> <br />SUBJECT: <br /> <br />Agenda topic for October 1, 2007 Commission Meeting: <br />Grant Application for Mapleton Multi-Use Path <br /> <br />I am recommending that Cass County apply for a Transportation <br />Enhancement (TE) Grant through the North Dakota Department of <br />Transportation (DOT) in the amount of $1 02,086.36 to construct phase 2 of <br />a multi-use path adjacent to Cass County 11 in Mapleton. I am further <br />recommending that Cass County split the 20% local construction costs not <br />to exceed $20,000 with the City of Mapleton required by the grant and fund <br />the administrative and engineering costs. <br /> <br />We have applied for TE funds for this project in the past unsuccessfully; <br />however for this application the project is divided into two phases to <br />improve the chances of funding, and create less of a need for local funding. <br />The second phase is approximately 1500 feet and runs from near the School <br />along residential areas and the golf course to near 1-94 and is being applied <br />to for TE Funds. <br /> <br />The DOT accepts applications for TE funds once a year. The deadline for <br />2009 TE fund requests is November 21, 2007. If successful in receiving the <br />grant, it would fund 80% of the construction costs. DOT rules allow only <br />Counties and Cities with populations over 5000 to apply for TE Funds <br />directly, therefore Mapleton can not apply directly for these grants so the <br />County has to act as a sponsor in order for the project to be eligible. <br /> <br />SUGGESTED MOTION: Authorize Chairman to sign an application for <br />a 2009 Transportation Enhancement grant for a multi-use path adjacent to <br />Cass County Highway 11 in Mapleton with and estimated construction cost <br />of$102,086.36. The approval is contingent upon the City of Mapleton <br />funding not less than 10% of the construction cost. <br /> <br />J:\Admin-Eng\Commission Corrsp\2007 Commission Correpondence\Agenda Memo for Oct 1 agenda Mapleton multi use path TE Funds.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.