e. Adopt 2024 to 2028 Cass County Comprehensive Highway and Bridge Plan
Laserfiche
>
Public
>
County Commission
>
2023
>
12-18-2023
>
Consent Agenda
>
e. Adopt 2024 to 2028 Cass County Comprehensive Highway and Bridge Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2023 4:02:55 PM
Creation date
12/11/2023 4:02:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
13 <br /> <br /> <br /> <br />Cass County Highways: Design Standards <br />The typical section of a County Highway is rural in nature with two lanes, either paved or gravel surface. <br />Different modes of travel and location of roadways to population centers, agricultural points of traffic, or <br />schools sometimes require different needs. Further drainage needs may vary from roadway to roadway. Table <br />4 summarizes the Design Standards for New or Reconstruction of Existing Cass County Highways. Starting in the <br />winter of 2021 select roads were increased to 65 mph, based on clear zone, vertical and horizontal curve data. <br />See Appendix 20 for more details. CMC (County Major Collector) roads that federal funds can be used for <br />reconstruction and paving projects. Off- System roads cannot utilize federal funding for road improvements but <br />can use them for bridges over 20’ in length. <br />
The URL can be used to link to this page
Your browser does not support the video tag.