3. Road Dept/Casselton elevator
Laserfiche
>
Public/Website
>
County Commission
>
2003
>
12-15-2003
>
Regular agenda
>
3. Road Dept/Casselton elevator
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2004 2:14:35 PM
Creation date
12/9/2003 3:45:35 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ri~I~ITY GOV 7012982395 12/15 '03 12:25 N0.812 01/08 <br /> <br /> DEC 1 5 <br /> <br />CASS COUNTY COMMISSION CONTRACT ~PROVAL ~QUEST <br /> <br /> CO~~ ~Q~S~G CO--CT: Moore End--g, ~c <br /> <br />DATE OF REQUEST: Dee 15. 2003 <br /> <br />DATE OF EXPECTED KE~ <br />TO THE COMMISSION OFFICE: <br />Dec 18, 2003 <br /> <br />DEPARTMENT HEAD REQUESTING SIGNATURE: ENG. <br />STATES ATTORNEY SIGNATURE: <br /> <br />STATES ATTORNEY COMMENTS: <br /> <br />PORTFOLIO COMMISSIONER SIGNATURE: <br /> <br />K BE, R. ND T282.2226 ~'~ <br /> <br />NOTE: THIS IS A PKOPOSED CONTRACT WITH MOORE ENGINEERING <br />FOR DESIGN AND CONSTRUCTION ENGINEEKING SERVICES FOR THE <br />CASSELTON ELEVATOR ROAD. THE PKOJECT CONCEPT REPORT <br />PREPARATION IS $5,150, DESIGN SERVICES $41,900, AND CONSTRUCTION <br />ENGINEERING SERVICES IS ACTUAL COSTS NOT TO EXCEED $106,165. <br /> <br />SUGGESTED MOTION: AUTHORIZE CHAIRMAN TO SIGN CONTRACT <br />WITH MOORE ENGINEERING FOR. DESIGN AND CONSTRUCTION <br />SERVICES FOP, THE CASSELTON ELEVATOR ROAD. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.