<br />Commission Minutes-August 13, 2007 3247 <br /> <br />RECESSED MEETING OF CASS COUNTY BOARD OF COMMISSIONERS <br />MEETING IN BUDGET SESSION <br />AUGUST 13, 2007 <br /> <br />1. MEETING TO ORDER <br />Chairman Scott Wagner reconvened the budget meeting at 8:30 AM on August 13, <br />2007, in the Commission Room, Cass County Courthouse, with members present as <br />follows: Robyn Sorum, Ken Pawluk, Darrell Vanyo and Scott Wagner. Vern Bennett <br />arrived later. Also present were County Auditor Michael Montplaisir, County <br />Administrator Bonnie Johnson and Accountants Mary Matheson and Alicia Hoellein. <br /> <br />2. ROAD DEPARTMENT <br />Keith Berndt, County Engineer, was present. He distributed a graph outlining the <br />highway distribution fund also known as the gas tax revenue for 1998 through 2008. <br />The fund typically has seen an increase of 2 1/2 % per year; however, in 2006, 2007 <br />and into 2008 the projection is for the fund to remain in a flat trend. This trend will likely <br />continue unless the legislature increases the gas tax. <br /> <br />Mr. Berndt stated that his proposed budget is $11,877,689 for 2008. This is a decrease <br />from 2007 in part due to the retirement of an employee, a position that will not be filled <br />as well as a decrease in proposed overlay miles for 2008. Plans are to do eight miles <br />of overlay, six of them on Cass County 17. He is proceeding with plans for the Cass 17 <br />design; however, the right-of-way costs are going to be high. He has increased the chip <br />sealing line item in the 2008 budget. The proposed budget includes $300,000 for re- <br />shaping of Cass 16 with the assumption county highway crews would complete the <br />work. The overall cost is more than $300,000 but some costs come from other budget <br />line items if the county completes the work with its own labor. The re-shaping should be <br />done if the commission wishes to proceed with asphalt surfacing in a future year. Mr. <br />Berndt said re-shaping that is done to a county highway in preparation for asphalt <br />surfacing requires widening. If the road is to remain graveled, it would be re-shaped to <br />a narrower width to allow for gravel road maintenance. If the board decides to proceed <br />with the Cass 16 project, Mr. Berndt recommends using two years of federal aid with the <br />balance using local funds. Pavements are tested on a five-year cycle and results are <br />used to prioritize the overlay projects. <br /> <br />Mr. Berndt said the bridges in Cass County are safe. Like most bridges across the <br />country, they are part of an aging infrastructure and needs outpace available revenues. <br />The proposed budget includes funds for replacement of the Cass 26 bridge over the <br />Red River at Perley. The project is scheduled to be awarded this fall with construction <br />in 2007 and 2008. The proposed budget includes the local match for replacement of <br />the Cass 7 bridge over the Maple River, but the federal funding year is uncertain so it <br />may be delayed until 2009 if the state cannot fund the federal portion in 2008. <br /> <br />Mr. Vanyo questioned the $15,000 budget item listed as remodeling. Mr. Berndt replied <br />plans are to replace lighting in the maintenance shop as the existing lights were <br />installed when the building was constructed and some supplemental florescent lighting <br />was installed by county staff. The current lighting is not sufficient for a maintenance <br />shop but the replacement need is not urgent. Mr. Vanyo asked if the remodeling <br />budget was reduced, could the project be done on a smaller scale. Mr. Berndt <br />consented to work with a smaller remodeling budget. <br />