Laserfiche WebLink
Page 1 of 3 <br /> <br /> <br /> <br /> <br /> <br />Cass County Planning Commission Staff Report <br /> <br />Entitlements <br />Requested: <br />Minor Subdivision (2 Lots) of a part of the NE ¼ of Section 5, Township 138 North, Range 50 West <br />Title: C.C. Third Subdivision Date: 10-12-2022 <br />Location: <br />NE ¼ of Section 5, Township <br />138 North, Range 50 West <br />(Warren Township) <br />Staff <br />Contact: Grace Puppe <br />Parcel Number: 67-0000-12619-070; <br />67-0000-12619-050 <br />Water <br />District: <br />Maple River Water <br />District <br />Owner(s)/Applicant: Gary Christianson Engineer/ <br />Surveyor: Houston Engineering <br />Status: Planning Commission Hearing: October 27, 2022 <br />Existing Land Use Proposed Land Use <br />Agriculture Residential <br /> <br />Proposal <br /> <br />The applicant is seeking approval of a minor subdivision entitled C.C. Third Subdivision to plat a two (2) Lot <br />subdivision of approximately 4 acres. According to the applicant, the subdivision is requested to create a lots for a <br />farm shop on each. One lot would be for son. <br /> <br />The proposed ownership and maintenance responsibility of the subdivision will be private. The subdivision will <br />use a new 165th Ave SE (County Road 15) road access, ditches for storm sewer conveyance, rural water, and on- <br />site septic systems for wastewater treatment. <br /> <br />Agency Comments <br />County Engineer <br />I have concerns with where a potential access point off of Cass 15 would be. The <br />very south end of these two lots would be around 985’ south of the intersection <br />with 42nd St SE. I would prefer this subdivision be built west of the CC 1st and <br />2nd Subdivisions along 42nd St. <br />Water Resource District No comments. <br />Cass County Electric Cooperative CCEC has an existing underground primary line serving the existing farmstead. <br />Century Link No comments were received prior to publishing the staff report. <br />Sprint Clear at this location. <br />AT&T No comments were received prior to publishing the staff report. <br />Xcel Energy No comments were received prior to publishing the staff report. <br />Agenda Item No. E.2