Laserfiche WebLink
AIA Document B103™ – 2017. Copyright © 2007 and 2017 by The American Institute of Architects. All rights reserved. The “American Institute <br />of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This <br />draft was produced by AIA software at 17:16:58 ET on 06/30/2022 under Order No.2114330455 which expires on 06/13/2023, is not for resale, <br />is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report <br />copyright violations, e-mail copyright@aia.org. <br />User Notes: (963532884) <br />3 <br />To be determined later by mutual agreement but based on the estimate provided by Construction Engineers, Inc. in <br />Exhibit ‘C’. <br />§ 1.1.4 The Owner’s anticipated design and construction milestone dates: <br />.1 Design phase milestone dates, if any: <br />Construction Documents completed in one bid package with the three (3) Prime bids to be issued for <br />bidding by the end of March 2023. <br />.2 Construction commencement date: <br />April 2023 – February 2025. <br />.3 Substantial Completion date or dates: <br />March 2025. <br />.4 Other milestone dates: <br />Facility occupancy April 2025. <br />§ 1.1.5 The Owner intends the following procurement and delivery method for the Project: <br />(Identify method such as competitive bid or negotiated contract.) <br />Competitive bid via three (3) Prime bidder process; General Construction, Mechanical and Electrical bid packages. <br />§ 1.1.6 The Owner’s requirements for accelerated or fast-track design and construction, multiple bid packages, or <br />phased construction are set forth below: <br />(List number and type of bid/procurement packages.) <br />Multiple bid packages as identified in Article 1.1.5 and issued on the same date. <br />§ 1.1.7 The Owner’s anticipated Sustainable Objective for the Project: <br />(Identify and describe the Owner’s Sustainable Objective for the Project, if any.) <br />None. <br />§ 1.1.8 The Owner identifies the following representative in accordance with Section 5.4: <br />(List name, address, and other contact information.) <br />Robert Wilson, County Administrator <br />Cass County <br />P.O. Box 2806 <br />Fargo, ND 58108-2806 <br />Telephone: (701) 241-5770 <br />Facsimile: (701) 297-5776 <br />Email: wilsonro@casscountynd.gov <br />§ 1.1.9 The persons or entities, in addition to the Owner’s representative, who are required to review the Architect’s <br />submittals to the Owner are as follows: <br />(List name, address, and other contact information.) <br />County Building Committee <br />§ 1.1.10 The Owner shall retain the following consultants and contractors: