Laserfiche WebLink
AIA Document B103™ – 2017. Copyright © 2007 and 2017 by The American Institute of Architects. All rights reserved. The “American Institute <br />of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This <br />draft was produced by AIA software at 17:16:58 ET on 06/30/2022 under Order No.2114330455 which expires on 06/13/2023, is not for resale, <br />is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report <br />copyright violations, e-mail copyright@aia.org. <br />User Notes: (963532884) <br />2 <br />TABLE OF ARTICLES <br />1 INITIAL INFORMATION <br />2 ARCHITECT’S RESPONSIBILITIES <br />3 SCOPE OF ARCHITECT’S BASIC SERVICES <br />4 SUPPLEMENTAL AND ADDITIONAL SERVICES <br />5 OWNER’S RESPONSIBILITIES <br />6 COST OF THE WORK <br />7 COPYRIGHTS AND LICENSES <br />8 CLAIMS AND DISPUTES <br />9 TERMINATION OR SUSPENSION <br />10 MISCELLANEOUS PROVISIONS <br />11 COMPENSATION <br />12 SPECIAL TERMS AND CONDITIONS <br />13 SCOPE OF THE AGREEMENT <br />ARTICLE 1 INITIAL INFORMATION <br />§ 1.1 This Agreement is based on the Initial Information set forth in this Section 1.1. <br /> (For each item in this section, insert the information or a statement such as “not applicable” or “unknown at time <br />of execution.”) <br />§ 1.1.1 The Owner’s program for the Project: <br /> (Insert the Owner’s program, identify documentation that establishes the Owner’s program, or state the manner in <br />which the program will be developed.) <br />The Architect shall base the design on Owner selected Option #2 or Option #4 in the Klein McCarthy Architects <br />Population Forecast and Design Options for the Jail, dated July 8, 2022, attached as Exhibit ‘C’. <br />§ 1.1.2 The Project’s physical characteristics: <br /> (Identify or describe pertinent information about the Project’s physical characteristics, such as size; location; <br />dimensions; geotechnical reports; site boundaries; topographic surveys; traffic and utility studies; availability of <br />public and private utilities and services; legal description of the site, etc.) <br />The Project includes one-story and the two-story additions and remodeling for connections. The Housing and <br />Support to be located to the east and the south of the Jail, the Medical Area to the east of the Jail and the Property <br />expansion to be located to the south of the existing Property area. <br />The additions to be based upon Options #2 or #4 per Exhibit ‘C’ and the same or complimentary exterior material <br />characteristics as the existing Jail facility. <br />§ 1.1.3 The Owner’s budget for the Cost of the Work, as defined in Section 6.1: <br />(Provide total and, if known, a line item breakdown.)