05-May 26, 2022 Planning Commission Meeting Packet Pt 2
Laserfiche
>
Public
>
Planning Commission
>
2022
>
05-May 26, 2022 Planning Commission Meeting Packet Pt 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 2:34:39 PM
Creation date
5/23/2022 2:34:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
May 19, 2022 <br />63 <br /> <br /> Each street shall be designed for its entire length, to meet the design requirements of the <br />most intense use with all non-residential uses designed to commercial/industrial street <br />standards. All plans shall be designed to provide for the entire required right-of- way and <br />roadway. <br />4. The right-of-way shall be measured from lot line to lot line and shall be sufficiently wide to <br />contain the roadway, curbs, shoulders, sidewalks, graded areas, utilities and shade trees. <br />5. The right-of-way width of a new street that is a continuation of an existing street shall in no <br />case be continued at a width less than the existing street. Where the right-of-way width of <br />the new street is greater than the existing street, a transition area shall be provided, the <br />design of which is subject to Commission approval. <br />(d) Shoulders. <br />1. The Planning Commission shall require construction of shoulders and drainage ditches <br />where curbs and gutter are not required. <br />2. Shoulder requirements shall vary according to street hierarchy and intensity of <br />development, or where non-motorized vehicle use is prevalent. <br />(e) Curb and Gutters. <br />1. Curbing may be required by the Planning Commission for: <br />a. Stormwater management <br />b. Road stabilization <br />c. To delineate parking areas <br />d. Ten feet on each side of drainage inlets <br />e. At intersections <br />f. At corners <br />g. At tight radii <br />2. Curb and gutter shall be required by the Planning Commission for all major subdivisions. <br />3. Curb requirements shall vary according to street hierarchy and intensity of development in <br />accordance with the requirements in Table Z Curb and Sidewalk Requirements. <br />4. Curbs shall be constructed according to the material and method specifications set forth in <br />the most recent version of the City of Fargo’s Standard Specifications for Construction of <br />Public Utilities, as it presently exists or may hereafter be amended. <br />5. Curbing shall be designed to provide a ramp for bicycles and/or wheelchairs at each <br />intersection, at the principal entrances to buildings which front on parking lots and at all
The URL can be used to link to this page
Your browser does not support the video tag.