05-May 26, 2022 Planning Commission Meeting Packet Pt 2
Laserfiche
>
Public
>
Planning Commission
>
2022
>
05-May 26, 2022 Planning Commission Meeting Packet Pt 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 2:34:39 PM
Creation date
5/23/2022 2:34:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
May 19, 2022 <br />59 <br /> <br />provide better access for emergency vehicles, fewer restrictions for snow removal and <br />improved pedestrian access. Curvilinear streets shall not be used immediately adjacent to <br />an existing grid street system without providing a transition that continues and protects the <br />historic grid. New project street systems, platted adjacent to an existing development, shall <br />not be merely looped back on local access streets, but shall connect with or be designed to <br />connect with, in the future, streets of a higher class (see Table 3. Residential Street <br />Hierarchy Definitions). Consideration shall be given to the dispersal of traffic from <br />commercial and employment centers and to the ultimate functioning of the street system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.