05-May 26, 2022 Planning Commission Meeting Packet Pt 2
Laserfiche
>
Public
>
Planning Commission
>
2022
>
05-May 26, 2022 Planning Commission Meeting Packet Pt 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 2:34:39 PM
Creation date
5/23/2022 2:34:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
May 19, 2022 <br />31 <br /> <br />2. Complete description of the right-of-way lines for all new streets. This description shall <br />include distances and bearings with curve segments comprised of central angle, radii, and <br />arc distances and also include arc, chord, bearing and distance for non-tangent curves. <br />3. Easements and the purpose of each must be clearly stated. Easement dimensions must be <br />sufficient to accurately describe their extent and boundaries. <br />4. Lot numbers and block designations. <br />5. Final street names. <br />6. Identification of any lands to be dedicated, reserved, donated or granted for public use or <br />for donation to any individual, religious society, corporation, or limited liability company. <br />7. Any plat which includes lands abutting upon any lake, river, creek, or stream must show a <br />contour line denoting the present shoreline, water elevation, and the date of survey. If any <br />part of a plat lies within the one hundred year floodplain of a lake, river, or stream as <br />designated by the department of water resources or a federal agency, the mean sea level <br />elevation of that one hundred year flood must be denoted on the plat by numerals. <br />Topographic contours at a two-foot contour interval referenced to mean sea level must be <br />shown for the portion of the plat lying within the floodplain. All elevations must be <br />referenced to a durable benchmark described on the plat with its location and elevation to <br />the nearest hundredth of a foot, which must be given in mean sea level datum. <br />8. The names and adjacent boundary lines of any adjoining platted lands must be dotted on <br />the plat. The designations and adjacent boundary lines of any unplatted parcels must be <br />dotted on the plat. <br />9. The location and material of all permanent monuments and lot line markers, including a <br />note that all monuments and lot line markers are set or indicating when they will be set. <br />10. Certificate, signature, and seal of the surveyor, to the effect that the survey is correct and <br />certificate, signature and seal of the surveyor, engineer, or landscape architect that <br />prepared the plat indicating that all other information shown on the plat is accurate. <br />11. A statement, duly acknowledged before an officer authorized to take acknowledgement of <br />deeds and signed by the landowner, to the effect that the subdivision shown on the plat is <br />the act and the deed of the owner, that all those signing are all the owners of the property <br />shown on the survey and plat and that they desire the same to be recorded as such. This <br />statement must be dated following the last change or revision to said plat. This statement <br />shall be of the form shown in Figure X. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.