2. Street Improvement Dist #2007-1
Laserfiche
>
Public
>
County Commission
>
2007
>
07-02-2007
>
Regular agenda
>
2. Street Improvement Dist #2007-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2007 9:32:41 AM
Creation date
6/26/2007 2:24:49 PM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Granberg Acres <br />Page 2 <br />June 12, 2007 <br /> <br />of probable cost. In order to ensure this maintenance a seal coat cost has been added to the <br />opmlOn. <br /> <br />Based on the description above a preliminary opinion of probable cost for the project was <br />prepared and is attached hereto. The preliminary opinion of probable construction cost for the 6- <br />inch asphalt pavement and future seal coat is approximately $404,550. Using a $10,000 Cass <br />County administration fee; approximately I O-percent for contingcncics; $15,000 for engineering <br />fees, the preliminary total project opinion of probable cost is approximately $470,000 dollars <br />(assuming 55 lots). A detailed breakdown of the project cost is attached to this letter. <br /> <br />It is intended that the description of the proposed project, opinion ofprobablc costs and attached <br />figures will provide the Granberg's Subdivision and Amber Plains Subdivision residents enough <br />information to move forward with the proposed project. <br /> <br />Pending the outcome of an assessment district vote, the subseq uent steps for the project will <br />include coordination with Ca..'lS County to establish the assessment district, completing final <br />design, preparing construction plans for the project, open contractor bids, awarding contract to <br />successful bidder, coordinate special assessment bonds issuance and other financial issues with <br />Cass County, and beginning construction. <br /> <br />Please note we have not tried to anticipate inflation or fluctuating oil prices in our attached <br />Opinion of Probable Cost for the project. Construction would be completed in 2007. <br /> <br />If you have any questions or concerns please fecI free to call. We look forward to continuing our <br />work on the project. <br /> <br />Sincerely, <br /> <br />H7ZEQ <br /> <br />Nicholas P. Pribula <br /> <br />NPP:np <br />Enclosure <br />G:\Johs by Number\5300\5343-000\Engineers Report 06-07-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.