Laserfiche WebLink
Init. <br />/ <br />AIA Document B203™ – 2017. Copyright © 2005, 2007 and 2017 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA <br />software at 12:39:00 ET on 12/22/2021 under Order No.4633161157 which expires on 06/13/2022, is not for resale, is licensed for one-time use only, and may only <br />be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. <br />User Notes: (1265062522) <br />3 <br />§ 2.6 The Architect shall provide the listed Site Evaluation and Project Feasibility Services only if specifically <br />designated below as the Architect’s responsibility. Unless otherwise specifically addressed in the Agreement, if <br />neither the Owner nor the Architect is designated, the parties agree that the listed Site Evaluation and Project <br />Feasibility Service is not being provided. <br />(Designate the Architect’s Site Evaluation and Project Feasibility Services and the Owner’s Site Evaluation and <br />Project Feasibility Services required for the Project by indicating whether the Architect or Owner shall be responsible <br />for providing the identified Site Evaluation and Project Feasibility Service.) <br />Services Responsibility <br />(Architect, Owner or Not Provided) <br />§ 2.6.1 Preliminary assessment of Owner’s <br />Development Objectives Architect <br />§ 2.6.2 Site evaluation Architect <br />§ 2.6.3 Identification of environmental requirements Not Provided <br />§ 2.6.4 Site context description Not Provided <br />§ 2.6.5 Cultural factor assessment Not Provided <br />§ 2.6.6 Historic resource inventory Not Provided <br />§ 2.6.7 Building evaluation Not Provided <br />§ 2.6.8 Conceptual drawings Architect <br />§ 2.6.9 Estimate of the cost of the Work Architect <br />§ 2.6.10 Public hearings and meetings Not Provided <br />§ 2.6.11 Other Site Evaluation and Project Feasibility <br />Services Not Provided <br />§ 2.7 Description of Services <br />A brief description of each Site Evaluation and Project Feasibility Service is provided below. <br />(If necessary, attach as an exhibit, or provide in Section 2.7, expanded or modified descriptions of the Site Evaluation and <br />Project Feasibility Services listed below.) <br />§ 2.7.1 Preliminary Assessment of Owner’s Development Objectives. Provide a preliminary assessment of the Owner’s <br />Development Objectives and identify constraints and opportunities that will impact them. <br />§ 2.7.2 Site Evaluation. Evaluate the site by, as applicable: (1) performing on-site observations; (2) assessing the physical <br />characteristics of the site; (3) assessing codes, ordinances, and regulations that impact the Owner’s Development <br />Objectives; (4) assessing utilities available to the site; and (5) assessing the access, circulation, and parking for the site. <br />The Architect shall make recommendations to the Owner based on its site evaluation. <br />(Paragraphs deleted) <br />§ 2.7.8 Conceptual Drawings. Prepare conceptual development drawings based on the Owner’s Development Objectives. <br />The drawings may show, as the Architect deems appropriate, land use, building placement, access and circulation of <br />vehicles and pedestrians, parking, utilities, site drainage, landscaping, and development phasing. <br />§ 2.7.9 Estimate of the Cost of the Work. Based on the Conceptual Drawings and other services provided, prepare an <br />estimate of the cost of the work for the development of the site. <br />(Paragraphs deleted) <br />ARTICLE 3 ADDITIONAL SERVICES <br />§ 3.1 Additional Services may be provided after execution of the Agreement, without invalidating the Agreement. Except <br />for services required due to the fault of the Architect, any Additional Services provided in accordance with this Article <br />shall entitle the Architect to compensation pursuant to Section 5.2 and an appropriate adjustment in the Architect’s <br />schedule.