Laserfiche WebLink
<br />Pro.iect MS 0702 - Houston Engineering Proposal <br />FOR: Cass County Highway 23 - CR10 to I 94 - Concrete Paving - Casselton Ethanol Plant <br /> <br />TEMl <br /> <br />D . <br /> <br />d <br /> <br />d . . <br /> <br />I - Prehmmal v esie:n an Proiect A mmlstratJon <br /> Hourlv Rate Estimated Hours Total Estimated Cost <br />Engineer I 128.00 12 $1,536.00 <br />Designer I 93.00 16 $1,488.00 <br />Engineer IV 83.00 24 $1,992.00 <br />Technician (CAD) 59.00 40 $2,360.00 <br />Clerical 45.00 4 $180.00 <br /> TASK 1 - TOTAL FEE $7,556.00 <br /> <br />ITEM 2 D . <br /> <br />PI <br /> <br />S .ft f <br /> <br />dE f t <br /> <br />- esum - ans. mecI Ica Ions an sima es <br /> Hourlv Rate Estimated Hours Total Estimated Cost <br />Engineer I 128.00 8 $1,024.00 <br />Engineer V 117.00 32 $3,744.00 <br />Designer I 93.00 148 $13,764.00 <br />Clerical 45.00 4 $180.00 <br />Mileage 0.45 100 $45.00 <br />Materials 100.00 2 $200.00 <br /> TASK 2 - TOTAL FEE $18,757.00 <br /> <br />ITEM 3 H d r S d <br /> <br />- lVI rau IC tu IV <br /> Hourlv Rate Estimated Units Total Estimated Cost <br />Engineer II 117.00 4 $468.00 <br />Engineer IV 83.00 20 $1,660.00 <br />Cad tech IV 53.00 1 $53.00 <br />Clerical 45.00 1 $45.00 <br /> TASK 3 - TOTAL FEE $2,226.00 <br /> Grand Total $28,539.00 <br />