2. Ordinance on highway accesses
Laserfiche
>
Public/Website
>
County Commission
>
2007
>
03-05-2007
>
Regular agenda
>
2. Ordinance on highway accesses
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2014 4:05:24 PM
Creation date
2/27/2007 10:54:35 AM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />11.4 Signage within the Right-of-Way <br /> <br />Standard signs and signage, as specified in the MUTCD, shall be used. The type, size, and <br />location of all traffic control signage shall be determined by the County Enginner. <br /> <br />As per the provisions of Section 4.1 and 12.4, the developer shall be responsible for all costs <br />associated with traffic control signage required for an access facility. <br /> <br />CHAPTER 12 <br /> <br />Construction Requirements <br /> <br />12.1 Notification of Utility Companies <br /> <br />The County, all applicable utility companies and North Dakota One Call must be notified before <br />construction work commences. <br /> <br />12.2 Modifications to Plans <br /> <br />Any modifications to approved engineering plans prior to permit issuance must be submitted and <br />approved by the Highway Department. <br /> <br />12.3 Traffic Control <br /> <br />Traffic control and protection measures are required during the construction phases if deemed <br />appropriate by the County Engineer. In such cases, a traffic control plan shall be submitted to <br />Highway Department with the engineering plans and specifications. Should adequate traffic <br />control measures not be in place, a representative of the Highway Department has the authority, <br />but not the duty to halt the construction until such time as the traffic control measures are in place <br />to safely and efficiently move traffic through the construction area. <br /> <br />The first infraction will result in the halting of construction until such time as traffic control <br />measures are corrected. The second infraction will result in the halting of construction for the <br />remainder of that day. Traffic control measures must be established prior to the start of the next <br />workday. Should there be a third infraction, the permit shall be revoked and there shall be a <br />meeting with the applicant and Highway Department to discuss what measures will be taken to <br />reinstate the permit. <br /> <br />29 <br /> <br />_"'" ~."."~711if' <br />
The URL can be used to link to this page
Your browser does not support the video tag.