c. Casselton/transprt enhancmnt
Laserfiche
>
Public/Website
>
County Commission
>
2003
>
11-17-2003
>
Consent agenda
>
c. Casselton/transprt enhancmnt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2004 2:14:33 PM
Creation date
11/10/2003 6:35:08 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASS COUNTY GOV 7012982395 <br /> <br />11/1~ '03 10:33 N0.494 03/08 <br /> <br />7. WHAT ENHANCEMENT ACTIVIETY CATEGORY/CATEGORIES BEST <br /> DESCRIBES YOUR PROJECT? <br /> <br />Category 1: Bicycle & Pedestrian Project <br /> a. the construction of bicycle and pedest'ian facilities <br /> <br />8, PROJECT DESCRIPTION <br /> <br />The project will include building a 10' wide multi-use concrete bike path along the <br />south side of ND Highway #18 to Tinta-Tawa Park on the northeast side of <br />Casselton. There will also be one block of bike path built on the south side of <br />Casselton on the west side of ND Highway #18 between Fairway Drive and <br />Cottonwood Drive, All work will be done on City or H~ghway right-of-way. <br /> <br />See attached drawings for location and typical sections. <br /> <br />9. PROJECT COST <br /> <br />Total Project Cost: $135,000 <br /> <br />Breakdown: <br /> Construction: $107,770 <br /> Engineering: $ 16,200 <br /> Contingencies: $ 11,030 <br /> Total: $135,000 <br /> <br />See attached detailed cost estimate. <br />The cost estimate was prepared by.' Kyle J. Meyer <br /> Project Engineer <br /> Moore Enginee-ing, Inc. <br /> 1042 14~ Ave. =.. <br /> West Fargo, ND 58078 <br /> 701-282-4692 (phone) <br /> 701-282-4530 flax) <br /> kmeyer @ mooreen~3i_neer_i._n.qinc.com <br /> <br />The City of Casselton is requesting 80% of the eligib'e funds (construction cost) from <br />the traffic enhancement program, <br /> $107,770 X 80% = $86,216,0_0. <br /> <br />10. HOW DOES THiS PROJECT RELATE TO SRUFACE TRANSPORTATION? <br /> <br />The multi-use bike path on the north side of town wil connect a multi-use path <br />already extended west of the Central Cass School, located at Cass County Highway <br />#10 and 8th Ave. The new path will connect the existing path to the City's Tinta- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.