Laserfiche WebLink
<br />Site 10: N020842-A-03 <br />Site Name: Hickson Wild Rice <br /> <br />Tenant Site 10: Hickson <br />Tenant Site Name: Hickson <br /> <br />EXHIBIT D <br />MINIMUM SITE INSTAllATION, OCCUPANCY AND MAINTENANCE REQUIREMENTS AND <br />SPECIFICATIONS <br /> <br />Pre-Installation Standards <br /> <br />1. Prior to installation, Tenant must provide Owner with complete plans for approval, including list of proposed <br />Equipment and subcontractors. No work may be performed until approval has been given and all criteria have <br />been met. All Equipment must be placed In approved locations only, and Owner must approve any changes <br />before the installation begins. The Owner or its representative shall have the right to be on site during any work <br />on the Site. Owner to provide price quote for installation services based on Tenant's scope of work. <br /> <br />Installation <br /> <br />2. (a) The following minimum protective devices must be properly installed: <br />(1) Lightning arrestors in feedline at wall feedthru ports (SBA multi-tenant buildings). (PCS providers <br />install jumpers to extend/connect to cabinet like enclosures). <br />(2) Surge protectors in any AC & phone line circuit. <br />(3) Transmitter RF shielding. (Must be in place during operation) <br />(4) Isolator/harmonic filter. (Must. be in place during operation) <br />(5) Duplexer or cavity bandpass filter. (Must be in place during operation) <br />(b) All Equipment, including transmitters, duplexers, isolators and multicouplers, must be housed in a metal <br />cabinet or rack mounted. No control stations or inverted transmit/receive frequency pairs are allowed on <br />repeater sites. <br />(c) All transmission lines entering the shelter must be 1/2" Heliax/Wellflex or better via a wall feedthru plate <br />and must terminate in a properly installed lightning arrestor with an 10 tag on both ends of the line. <br />(d) Solid outer shield cable such as Superflex or HeliaxlWellflex must be used for all intercabling outside the <br />cabinet. Under no circumstances will the use offoil shielded or braided RF cable (e.g; RGB) be permitted <br />outside the cabinet except for RG-6 quad shield cable installed on satellite receive only systems. <br />(e) All antenna, power and phone cables will be routed and properly supported to the base station in a neat <br />manner using routes provided for that purpose. Tenant will provide individual Transient (SAD) surge <br />protection to each circuit used. All phone lines will have (SAD) transient surge protection installed. All <br />wiring and installation will be by means of clamping or strapping and in no event will any members or <br />other parts of the tower be drilled, welded, punched or otherwise mutilated or altered. <br />(f) All Tenants are to obtain power from the power panel and/or AC receptacle provided for their speCific use. <br />(9) All outside RF equipment cabinets must be grounded to the Site ground system using #2 solid tinned wire <br />with cadweld, silver solder connections, or 2 hole lugs with Burndy type compression fittings. All inside RF <br />equipment cabinets must be grounded to the Site ground system using #2, or #6 green jacketed stranded <br />wire with silver solder connections, or 2 hole lugs with Burndy type compression fittings. <br />(h) All antenna lines will be electrically bonded to the tower at the antenna and at the bottom of the tower <br />using grounding kits installed per manufacturer specifications and all antenna brackets must be pre- <br />approved. All antenna lines entering the Site will have COAX center pin lightning protection installed <br />within two feet from the entry port and grounded to master ground bar in the Site ground system. <br />(I) All equipment cabinets will be identified with a typed label under plastic on which the Tenant's name, <br />address, 24 hour phone number, call sign, and frequencies will be inscribed, in addition to a copy of <br />Tenant's FCC license. <br />(j) Monitor speakers will be disabled except when maintenance is being performed. All antenna lines will be <br />tagged within 12 inches of the termination of the feeder cable at both ends, at the entrance to the <br />building, at repeater or base station cabinet. and at the multicoupler/combiner ports. <br />(k) All ferrous metals located outside of the building or on the tower will be either stainless steel or hot dipped <br />galvanized, not plated. Painted towers will require the painting of feedlines by the Tenant, unless <br />installed by Owner, prior to or before completion of the install. All transmission lines are to be secured <br />with factory hoist grips every 150' and secured to the tower or cable ladder with stainless steel and/or hot <br />dipped galvanized hardware. Plastic wraps and/or bandit type hangers will not be accepted. <br /> <br />ANTS1TE 11-20-00 Other <br />July 31, 2006 <br /> <br />13 <br /> <br />Tenantlnitials:_ Owner Inltials:_-[fBAIl) <br />