Laserfiche WebLink
SWC Project No. 1751-06 <br /> September 16, 2003 <br /> <br /> Agreement for Cost Participation <br /> by the North Dakota State Water Commission <br /> in the Maple River Flood Insurance Study <br />Digital Imagery, Hydraulic Analysis, and Topographic Mapping Project <br /> <br /> 1. PARTIES. This agreement is between the State of North Dakota (State), <br />by and through the State Water Commission (Commission), through its Secretary/State <br />Engineer, Dale L. Frink (Secretary); and the Cass County Commission (County), acting <br />through its Chairman, Scott Wagner. The Commission and the County are referred to as <br />the parties. <br /> <br /> 2. INTENT. The $28,470 approved and authorized by the State Water <br />Commission, from the funds appropriated to the Commission in the 2003-2005 biennium, <br />to the County on August 6, 2003, will be used to pay for 35% of the eligible costs <br />incurred in the Maple River Flood Insurance Study Digital Imagery, Hydraulic Analysis, <br />and Topographic Mapping Project (Project). <br /> <br /> 3. PROJECT DESCRIPTION AND LOCATION. The Maple River Flood <br />Insurance Study encompasses aerial photography, LIDAR acquisition, ground control, <br />aerotriangulation, LIDAR processing, planimetric map compilation, and <br />orthophotography for the 91 square miles described on the map herein. The analysis and <br />mapping will be used to update the Federal Emergency Management Agency's Flood <br />Insurance Restudy/Study. The Commission has cost participated in three previous Red <br />River Flood Insurance Study digital imagery, hydraulic analysis, and topographic <br />mapping projects with the County. Thus this Project is referred to as Phase IV. <br /> <br /> <br />