f. Contract approval
Laserfiche
>
Public
>
County Commission
>
2005
>
12-05-2005
>
Consent agenda
>
f. Contract approval
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2005 1:48:56 PM
Creation date
11/29/2005 1:48:53 PM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(Usury laws and requirements under the Federal Truth in Lending Act, similar .state and local consumer credit laws <br />and other regulations at the Owner's and Contractor's principal places of business, the location of the Project and <br />eLsewhere may affect the validity of this provision. Legal advice should be obtained with respect to deletions or <br />modifications, and also regarding requirements .such as written disclo.sures or waivers.) <br /> <br />~ 7.3 The Owner's representative is: <br />(Name, address and other information) <br /> <br />Bonnie Johnson. Countv Coordinator <br />Cass Countv Courthouse <br />211 Ninth Street South <br />Fqo. North Dakota 58103 <br /> <br />~ 7.4 The Contractor's representative is: <br />(Name, address and other information) <br /> <br />Ted Malaterre <br />Robert Gibb & Sons. Inc. <br />205 40th Street Southwest <br />P. O. Box 10188 <br />Fax'f:o. NO 58103 / 58106 <br /> <br />~ 7.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the <br />other party. <br /> <br />~ 7.6 Other provisions: <br /> <br />N/A <br /> <br />ARTICLE8 ENUMERATIONOFCONTRACTDOCUMENTS <br />~ 8.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as <br />follows: <br /> <br />~ 8.1.1 The Agreement is this executed 1997 edition of the Standard Form of Agreement Between Owner and <br />Contractor, AlA Document AI01-1997. <br /> <br />~ 8.1.2 The General Conditions are the 1997 edition of the General Conditions of the Contract for Construction, AlA <br />Document A201-1997. <br /> <br />~ 8.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual dated <br />July. 2005 , and are as follows <br /> <br />Document <br />Article 15 <br /> <br />Title <br />Sunnlementarv Conditions <br /> <br />Pages <br />~ <br /> <br />~ 8.1.4 The Specifications are those contained in the Project Manual dated as in Section 8.1.3, and are as follows: <br />(Either list the Specifications here or refer to an exhibit attached to thi.s Agreement.) <br />Title of Soocifications exhibit: Table of Contents-Books 1 and 2 - Biddin~ and Contract Reauirements. Division 15- <br />Mechanical (Plumbing & Snrinklers) and Division 15 - Mechanical mv AC), <br />SMtiM ~ P.ge& <br /> <br />AlA Document A101T11-1997. Copyright Cl1915, 1918, 1925,1937,1951,1958,1961,1963, 1967,1974, 19n, 1987, 1991 and 1997 by The American <br />Institute of Architects. All rights reserved. WARNING: This AlAe Document Is protected by U.S. Copyright Law and International Treaties. 5 <br />Unauthorized reproduction or dlatrlbutlon of this AlAe Document, or any portion of It, may result In severe civil and criminal penalties, and will be <br />prosecuted to the maximum extent pOIslble under the law. This document was produced by AlA soflware at 08:49:03 on 09/15/2005 under Order <br />No.1oo0192558_1 which expires on 8/111'2006, and is not for resale. <br />User Nofes: (691706547) <br />
The URL can be used to link to this page
Your browser does not support the video tag.