f. Contract approval
Laserfiche
>
Public
>
County Commission
>
2005
>
12-05-2005
>
Consent agenda
>
f. Contract approval
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2005 1:48:56 PM
Creation date
11/29/2005 1:48:53 PM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ 5.1.7 The progress payment amount determined in accordance with Section 5.1.6 shall be further modified under <br />the following circumstances: <br /> <br />.1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to the <br />full amount of the Contract Sum, less such amounts as the Architect shall determine for incomplete <br />Work, retainage applicable to such work and unsettled claims; and <br />(Section 9.8.5 of AlA Document A201-1997 require.s release of applicable retainage upon Substantial <br />Completion of Work with consent of surety, if any.) <br /> <br />.2 Add, if final completion of the Work is thereafter materially delayed through no fault of the <br />Contractor, any additional amounts payable in accordance with Section 9.10.3 of AlA Document <br />A201-1997. <br /> <br />~ 5.1.8 Reduction or limitation of retainage, if any, shall be as follows: <br />(If it is intended, prior to Substantial Completion of the entire Work, to reduce or limit the retainage resulting from <br />the percentages inserted in Sections 5.1.6.1 and 5.1.6.2 above, and this is not explained elsewhere in the Contract <br />Documents, insert here provision.s for such reduction or limitation.) <br /> <br />With satisfactorY oroiect oro~ss and workmanshio. retaina~e will cease once 7.5% of the contract amount <br />has been retained. <br /> <br />~ 5.1.9 Except with the Owner's prior approval, the Contractor shall not make advance payments to suppliers for <br />materials or equipment which have not been delivered and stored at the site. <br /> <br />~ 5.2 FINAL PAYMENT <br />~ 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the <br />Contractor when: <br /> <br />.1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct <br />Work as provided in Section 12.2.2 of AlA Document A201-1997, and to satisfy other requirements, <br />if any, which extend beyond final payment; and <br /> <br />.2 a final Certificate for Payment has been issued by the Architect. <br /> <br />~ 5.2.2 The Owner's final payment to the Contractor shall be made no later than 30 days after the issuance of the <br />Architect's final Certificate for Payment, or as follows: <br /> <br />N/A <br /> <br />ARTICLE 6 rERMINA nON OR SUSPENSION <br />~ 6.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AlA Document <br />A201-1997. <br /> <br />~ 6.2 The Work may be suspended by the Owner as provided in Article 14 of AlA Document A20l-1997. <br /> <br />ARTICLE 7 MISCELLANEOUS PROVISIONS <br />~ 7.1 Where reference is made in this Agreement to a provision of AlA Document A201-1997 or another Contract <br />Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract <br />Documents. <br /> <br />~ 7.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated <br />below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is <br />located. <br />(Insert rate of interest agreed upon, if any.) <br /> <br />) Der annum <br /> <br />AlA Document A101T11-1997. Copyright C> 1915,1918,1925.1937,1951,1958,1961.1963,1967,1974,1977, 1987.1991 and 1997 by The American <br />Institute of ArchiteclS. All rights reserved. WARNING: ThIs AlAe Document Is protected by U.s. Copyright Law and Intsmatlonal Treaties. 4 <br />Unauthorized reproduction or distrIbution of this AlAe Document, or any portion of II. may resull In severe clvO and criminal penalt.... snd will be <br />prosecuted to the maximum extent possIble under the law. This document was produced by AlA software at 08:49:03 on 09/15/2005 under Order <br />No.1ooo192558_1 which expires on 8/1112006, and is not for resale. <br />User Notes: (691706547) <br />