c. Contract approval
Laserfiche
>
Public
>
County Commission
>
2005
>
11-21-2005
>
Consent agenda
>
c. Contract approval
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2005 11:00:42 AM
Creation date
11/14/2005 2:21:50 PM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. Any required UPS power systems. <br /> <br />. Required 120 V AC 60 Hz power to supply the equipment. <br /> <br />Combiner/Multicou piers <br /> <br />At the present time the Federal CO!!Wlunieati~ns Commission has not granted licenses for <br />the operation of the system. It is~~!~~iesponsibility the identify and license <br />frequencies for each site. Once thIS process has been completed, custom <br />combiner/multicoupler equipment will be desigQ~dand man.u.factured for each site. Costs <br />--.- ( ~ <br />for ~~is equipme~t have been estimate~(The City of Fa.rgois res~onsible for any <br />addItIOnal combmer costs that may be mcurredaftenhe frequencIes have been <br />determined. <br /> <br />The estimated costs for the combiner/muticoupler equipment are based on Motorola's <br />previous experience in VHF system design. These costs are based on protecting the <br />receive equipment supplied by Motorola from the transmit equipment supplied by <br />Motorola. No costs have been included to protect the system from other equipment. <br /> <br />Coverage <br /> <br />Maps have been supplied for information only and no coverage guarantees are provided. <br />One day of coverage measurements are included in the proposal. These measurements <br />are designed to provide Fargo with information on locations were there is coverage and <br />were coverage is marginal. It is not a test of system performance. Acceptance of the <br />system will not depend on the results of the coverage measurements. <br /> <br />Transport <br /> <br />The system design is based on the following customer supplied transport: <br /> <br />. Console Dispatch Center to Fargo Hi Rise - One digital TI circuit. <br /> <br />. 45th Street Tank to Fargo Hi Rise - One digital TI circuit. <br /> <br />. Oakport Water Tank to Fargo Hi Rise - five leased 4-wire circuits. <br /> <br />. School Tank to Fargo Hi Rise - five leased 4-wire circuits. <br /> <br />. SW Tank to Fargo Hi Rise - five leased 4-wire circuits. <br /> <br />· NDSU Seim Hall to Fargo Hi Rise - five leased 4-wire circuits. <br /> <br />. AAT Tower to Fargo Hi Rise - five leased 4-wire circuits. <br /> <br />Fargo, North Dakota <br /> <br />System Description <br /> <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.