Laserfiche WebLink
Increased Cost of Clay Fill Material: <br /> 3900 cy @ 15 cy/Ioad = 260 loads <br /> Truck Rental @ $ 60.00 / hr <br /> Trip Time: .75 hr / load <br /> Increased Cost = 260 loads x .75 hrs/Ioad x $ 60.00 / hr = $11,700.00 <br /> <br />Clay Fill Cost: $ 11,700.00 <br /> <br />SUMMARY OF DELAY COSTS: <br /> Date Daily <br /> <br />Cumlative <br /> <br />April 14, 2003 $ 1,700.58 $ 1,700.58 <br />April 15, 2003 $ 4,684.65 $ 6,385.23 <br />April 16, 2003 $ 4,684.65 $ 11,069.88 <br />Apdl 17, 2003 $ 4,074.10 $ 15,143.99 <br />April 18, 2003 $ 4,074.10 $ 19,218.09 <br />April 21, 2003 $ 4,074.10 $ 23,292.19 <br />April 22, 2003 $ 4,074.10 $ 27,366.30 <br />Loss of Clay $ 11,700.00 $ 39,066.30 <br /> <br /> $ 39,066.30 <br /> <br />TOTAL DELAY COSTS FROM SUSPENSION: $ <br /> <br />39,066.30 <br /> <br /> <br />