2. Jail/Shff Res change order
Laserfiche
>
Public/Website
>
County Commission
>
2003
>
05-19-2003
>
Regular agenda
>
2. Jail/Shff Res change order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2004 2:14:16 PM
Creation date
5/13/2003 1:39:33 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 17 & 18: Delay Cost,/Day <br /> <br />Labor and Equipment: <br />Pickup (1-10) <br />Pickup (1-26) <br />Flatbed (2-5) <br />Mechanic Truck (2-11 ) <br />Honda Generator (4-90) <br />Case 580 Tractor/Loader (21-4) <br />Skytrack Forklift (21-2) <br />Komatsu WA75 Loader (21-38) <br />Manbasket (39-054) <br />· Rental: Dynalift <br />Rental: PC 600 Excavator <br />Sidedumps: 3.00 EA @ $ <br />Tandems: 2.00 EA @ $ <br />SuperviSion: <br /> <br />$ 54.30 <br />$ 48.33 <br />$ 61.25 <br />$ 26.20 <br />$ 9.05 <br />$ 88.98 <br />$ 66.16 <br />$ 66.78 <br />$ 16.14 <br />$ 225.67 <br />$ 1,261.67 <br />223.11 $ 669.33 <br />147.53 $ 295.06 <br /> $ 568.75 <br /> <br /> Direct Cost: $ 3,457.67 <br />Overhead: 9.1% $ 314.65 <br /> $ 3,772.32 <br />Profit: 8.0% $ 301.79 <br /> Daily Cost: $ 4,074.10 <br /> <br />April 21 & 22: Delay Cost I Day <br /> <br />Labor and Equipment: <br />Pickup (1-10) $ 54.30 <br />Pickup (1-26) $ 48.33 <br />Flatbed (2-5) $ 61.25 <br />Mechanic Truck (2-11 ) $ 26.20 <br />Honda Generator (4-90) $ 9.05 <br />Case 580 Tractor/Loader (21-4) $ 88.98 <br />Skytrack Forklift (21-2) $ 66.16 <br />Komatsu WA75 Loader (21-38) $ 66.78 <br />Manbasket (39-054) $ 16.14 <br />Rental: Dynalift $ 225.67 <br />Rental: PC 600 Excavator $ 1,261.67 <br />Sidedumps: 3.00 EA @ $ 223.11 . $ 669.33 <br />Tandems: 2.00 EA @ $ 147.53 $ 295.06 <br />Supervision: $ 568.75 <br /> <br /> Direct Cost: $ 3,457.67 <br />Overhead: 9.1% $ 314.65 <br /> $ 3,772.32 <br />Profit: 8.0% $ 301.79 <br /> Daily Cost: $ 4,074.10 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.