TECHNICAL ADVISORY GROUP RECOMMENDATION <br /> <br />TAG_CONTRACTINGRECOMMENDATIONFORM_WP-42E_IBI_CO-01_2019-0214 3 <br />b. The Engineer reviewed the quantities and Contractor direct and indirect cost proposals for these  <br />changes and found them to be reasonable for the proposed scope of work.  <br />4. Foundation Debris Removal:  A larger piece of concrete was encountered at the Lift Station excavation  <br />that was not shown on the Contract Documents.  The Contractor proposed a lump sum cost of  <br />$1,280.00 to remove and dispose of it off‐site.    <br />a. The Engineer agreed that this was an additional project cost, reviewed the Contractor’s  <br />proposed price, found it to be reasonable, and directed the Contractor to remove and dispose of  <br />it off‐site.  <br />b. This change adds the following bid item:  <br />i. Bid Item 0178, Remove Building Foundation CO‐1: lump sum quantity of 1.0 LS at the  <br />Contract Unit Price of $1,280.00 per LS for a price increase of $1,280.00.   <br />5. Gatewell Structural Backfill: The Contractor’s selected method to support the walls of Gatewell  <br />excavation was a cofferdam.  The cofferdam was design by the Contractor and they recommended CLSM  <br />backfill from elevation 873.15 to 884.00 and structural clay from elevation 884.00 to 900.00 to backfill  <br />the space between the finished exterior Gatewell wall and the cofferdam.  The Engineer’s design was  <br />based on an open cut excavation and did not include CLSM and structural clay bid items to backfill the  <br />space between the finished exterior Gatewell wall and the cofferdam.    <br />a. The Owner reviewed and agreed that the cost of these items should be added to the Contract  <br />Price.  <br />b. The Engineer determined the quantities of CLSM and structural clay and agreed with the  <br />Contractor’s proposed unit prices.  <br />c. This change adds the following bid items for Gatewell structural backfill material at a cost of  <br />$52,025.50:  <br />i. Bid Item 0179, Gatewell Structural CLSM Backfill CO‐1: lump sum quantity of 1.0 LS at  <br />the Contract Unit Price of $26,885.50 per LS for a price increase of $26,885.50.  <br />ii. Bid Item 0180, Gatewell Structural Clay Backfill CO‐1: lump sum quantity of 1.0 LS at the  <br />Contract Unit Price of $25,140.00 per LS for a price increase of $25,140.00.  <br />  <br />