Laserfiche WebLink
METRO FLOOD DIVERSION PROJECT <br /> <br />TAG_CONTRACTINGRECOMMENDATIONFORM_WP-42E_IBI_CO-01_2019-0214 1 <br />Technical Advisory Group Recommendation Meeting Date: 02/14/2019  <br />RECOMMENDATION FOR ACTION:  <br />The Technical Advisory Group has reviewed and recommends approval of the following Contract Action(s).  <br />SUMMARY OF CONTRACTING ACTION:  <br />Per the contract review and approval procedures that were adopted by the Diversion Authority on November  <br />10, 2016 and amended August 23, 2018, the Owner’s Program Management Consultant (PMC) or Engineer of  <br />Record (EOR) shall submit construction Change Order requests that are greater than $50,000 to the Technical  <br />Advisory Group. The Technical Advisory Group shall review the Change Order request during its next regular  <br />meeting after receiving the Change Order request, and make a recommendation as to approval or denial of the  <br />Change Order request.  <br />The Owner’s Representative has prepared the following Contract Action(s):   <br />Description <br />Budget <br />Estimate ($) <br /> <br />WP-42E: Industrial Builders, Inc. <br />Change Order #01 $(240,636.15)  <br /> Remove Main Avenue Project Overlap work items from the Contract  <br /> Add CLSM pipe cradles, foundation debris removal, and Gatewell structural backfill  <br />  <br />Summary of Contracting History and Current Contract Action:  <br />The Diversion Authority awarded the WP‐42E (In‐Town Levees ‐ 2nd Street South and Main Avenue Flood  <br />Mitigation) construction contract to Industrial Builders, Inc. (IBI)(Contractor) on September 27, 2018.  Notice To  <br />Proceed was granted and the Effective Date of the Contract was October 17, 2018.  <br />Since the start of construction, several change items have been identified.  The Contractor, Engineer of Record,  <br />and Owner have since incorporated these changes into this change order.    <br />This change order removes Main Avenue Project Overlap work items, and adds CLSM pipe cradles, foundation  <br />debris removal, and Gatewell structural backfill.  <br />The following is a summary of contracting history to date along with the current contracting action.  <br />Original  <br />Agreement or  <br />Amendment  <br />Budget ($)  <br />Change  <br />Original Project  <br />Cost  <br />Revised Project  <br />Cost Project Start  <br />Project  <br />Completion Comments  <br />Original  <br />Contract  <br /> $8,769,445.23  17‐Oct‐18 01‐Jul‐20 Contract Award to IBI.