2a. Road Dept/storm water plan
Laserfiche
>
Public/Website
>
County Commission
>
2003
>
03-03-2003
>
Regular agenda
>
2a. Road Dept/storm water plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2004 2:14:08 PM
Creation date
3/3/2003 4:39:26 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINIMUM CONTROL MEASURE 6 - POLLUTION PREVENTION <br /> (GOOD HOUSEKEEPING) FOR MUNICIPAL OPERATIONS <br /> <br />II. <br /> <br />III. <br /> <br />Target Audience <br /> <br />Activities planned under the Pollution Prevention (Good Housekeeping) for Municipal <br />Operations portion of the Storm Water Pollution Prevention Program (SWPPP) for Cass <br />County will be directed toward county staff. <br /> <br />Goals <br /> <br />The SWPPP activities implemented under Minimum Control Measure (MCM) 6 will <br />focus on developing and implementing general procedures for the Cass County <br />operations and maintenance program that will reduce or eliminate the impacts of storm <br />water pollution from open space maintenance, snow disposal, vehicle and building <br />maintenance, land disturbances, and storm conveyance system maintenance plan during <br />the permit term. <br /> <br />Best Management Practices <br /> <br />Develop a Storm Water Conveyance System Cleaning Prouram <br />The Cass County Engineer's Office, in cooperation with the city of Fargo, will <br />develop procedures for the annual inspection and cleaning of storm conveyance <br />systems to reduce the amount of pollutants, trash, debris, and sediments. This <br />program shall be applied to material and waste-handling areas, paved and <br />vegetative areas, waterways (coulees), and new development projects. A summary <br />of all inspections and repairs shall be maintained and submitted in the annual <br />report. <br /> <br />Measurable Goals: <br />$ Whether or not areas with high pollutant loadings were inventoried and <br /> prioritized for cleaning. <br />$ Length of storm conveyance system cleaned regularly. <br />$ Twenty percent (20%) of all storm conveyance systems maintained by Cass <br /> County will be inspected and cleaned each year during the permit tenn. <br /> <br />Partner: <br />City of Fargo <br /> <br />Responsible Department: <br />Cass County Engineer's Office <br /> <br />aJ <br /> <br />Develop and Implement a Vehicle Maintenance Facility Site Plan <br />The Cass County Engineer's Office will develop and implement a vehicle <br />maintenance facility site-specific plan within 90 days (June 10, 2003) of obtaining <br /> <br />23 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.