2a. Road Dept/storm water plan
Laserfiche
>
Public/Website
>
County Commission
>
2003
>
03-03-2003
>
Regular agenda
>
2a. Road Dept/storm water plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2004 2:14:08 PM
Creation date
3/3/2003 4:39:26 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IV. <br /> <br />disturb greater than or equal to 1 acre, including projects that are less than 1 acre <br />and are part of a larger development plan, that discharge into the storm <br />conveyance system during the permit term. <br /> <br />Measurable Goals: <br />$ Number of flyers, posters, or other public education tools distributed. <br />$ Number of training programs offered to facilities and operation staff. <br /> <br />Partner: <br />City of Fargo <br /> <br />Responsible Department: <br />Cass County Engineer's Office <br /> <br />BMP Implementation Schedule and MCM 5 Performance Measures <br /> <br />Implementation Planned Performance Measures <br /> <br />Year 1 <br /> <br />Begin investigation of the strategies for structural and <br />nonstructural BMPs; begin working with local partners to develop <br />these strategies; collect educational information from the city of <br />Fargo for the public outreach program; investigate a long-term <br />inspection and maintenance program; hold the annual public <br />meeting on the SWPPP; and provide the annual report to the North <br />Dakota Department of Health (NDDH). <br /> <br />Year 2 <br /> <br />Develop vegetative practices programs with the city of Fargo; <br />develop a long-term inspection and maintenance program; develop <br />educational information with the city of Fargo for the public <br />outreach program; hold the annual public meeting on the SWPPP; <br />and provide the annual report to NDDH. <br /> <br />Year 3 <br /> <br />Continue to develop vegetative practices programs with the city of <br />Fargo; complete development of the long-term inspection and <br />maintenance program; implement educational information by the <br />city of Fargo for the public outreach program; hold the annual <br />public meeting on the SWPPP; and provide the annual report to <br />NDDH. <br /> <br />Year 4 <br /> <br />Implement the strategies for the BMPs; begin implementation of <br />vegetative practices programs with the city of Fargo; implement <br />the long-term inspection and maintenance program; continue with <br />the educational public outreach program by the city of Fargo; hold <br />the annual public meeting on the SWPPP; and provide the annual <br />report to NDDH. <br /> <br />21 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.