2a. Road Dept/storm water plan
Laserfiche
>
Public/Website
>
County Commission
>
2003
>
03-03-2003
>
Regular agenda
>
2a. Road Dept/storm water plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2004 2:14:08 PM
Creation date
3/3/2003 4:39:26 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINIMUM CONTROL MEASURE 3 - ILLICIT DISCHARGE DETECTION AND <br /> ELIMINATION <br /> <br />II. <br /> <br />III. <br /> <br />Target Audience <br /> <br />Activities planned under the Illicit Discharge Detection and Elimination portion of the <br />Storm Water Pollution Prevention Program (SWPPP) for Cass County will be directed <br />toward citizens with an emphasis on the industrial and commercial members. <br /> <br />Goals <br /> <br />The SWPPP activities implemented under Minimum Control Measure (MCM) 3 will <br />focus on the development, implementation, and enforcement of management strategies <br />that will lead to the reduction or elimination of the impacts of illicit pollutant discharges <br />into the storm water conveyance system during the permit term. <br /> <br />Best Management Practices <br /> <br />Develop a Storm Water Conveyance System Map <br />The Cass County Engineer's Office will develop a storm water conveyance <br />system map that will show the location of all: <br /> <br />2. <br />3. <br />4. <br /> <br />Ponds, coulees, and wetlands. <br />Any structural pollution control devices. <br />Any conveyances 24 inches or larger in diameter. <br />Any discharge points leaving the system including: <br />a. Any discharges from the county system to the city of Fargo systems, <br /> waters, or wetlands. <br />b. Discharges to the groundwater. <br />c. Overland discharges. <br />d. Any other known outlet points in the county storm water conveyance <br /> system. <br /> <br />Measurable Goals: <br />$ Linear feet of conveyances recorded. <br />$ Number of structural pollution control devices counted. <br />$ Number of discharge points recorded. <br /> <br />Responsible Department: <br />Cass County Engineer's Office <br /> <br />Be <br /> <br />Develop a Program to Detect~ ldentify~ and Eliminate Illicit Discharues <br />The Cass County Engineer's Office will develop and implement a program to <br />detect and identify any illicit discharges to the Red River or the city of Fargo <br /> <br />10 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.