09-27-2018
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2018
>
09-27-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2018 10:32:46 AM
Creation date
11/28/2018 2:36:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
METRO FLOOD DIVERSION PROJECT <br /> <br /> <br />TAG-ED_CONTRACTING RECOMMENDATION_NAASTADBROTHERS_2018-0924 1 <br />Technical Advisory Group and Executive Director Contracting Recommendation Date: 09/24/2018 <br />RECOMMENDATION FOR ACTION: <br />The Technical Advisory Group and Co‐Executive Directors have reviewed and recommended approval of the <br />following Contract Action(s). <br />SUMMARY OF CONTRACTING ACTION: <br />Per the contract review and approval procedures that were adopted by the Diversion Authority on November <br />10, 2016 and amended August 23, 2018, the Owner’s Program Management Consultant (PMC) or Co‐ <br />Executive Directors shall submit a proposed Contract (value >$10,000 and <$150,000) to Technical Advisory <br />Group for review, and shall consolidate the recommendations of the Technical Advisory Group and the Co‐ <br />Executive Directors onto a single form and submit the written recommendation to the Finance Committee. <br />The Owner’s PMC has prepared the following Contract Action(s): <br />Naastad Brothers, Inc. <br />Cass County Road Ditch Work $30,856.40 <br /> Hwy 81 temporary approach removal <br /> 6,200 LF of CR‐17 ditch cleaning <br />BACKGROUND AND DISCUSSION: <br />The PMC has worked with Flood Diversion staff to procure pricing for two (2) construction tasks scheduled to be <br />done this fall in Cass County roadway ditches. <br /> <br />The work under this proposed Contract includes the removal of a Hwy 81 temporary approach and approximately <br />6,100 lineal feet (LF) of CR‐17 ditch cleaning, described below: <br /> <br />1. Hwy 81 approach removal. A temporary approach was installed by one of the OHB Ring Levee demolition <br />contractors to provide better access to a project borrow area. Now that that work is done, the temporary <br />approach needs to be removed and the approach removal work was not included in that construction <br />contract. <br />2. CR‐17 ditch cleaning. Approximately 6,200 LF of CR‐17 east and west roadway ditches, north of CR‐16 and <br />the temporary CR‐17 bypass, need to be cleaned and regraded to facilitate drainage. <br />The table below summaries the contracting history for this task order and the current contracting action. <br />SUMMARY OF CONTRACTING HISTORY AND CURRENT CONTRACT ACTION: <br />Original <br />Agreement or <br />Amendment <br />Budget ($) <br />Change <br />Original <br />Project Cost <br />Revised <br />Project Cost <br />Project <br />Start <br />Project <br />Completion Comments <br />Service Contract $30,856.40 27‐Sep‐18 31‐Dec‐18 Hwy 81 temporary approach removal and <br />6,200 LF of CR‐17 ditch cleaning. <br />
The URL can be used to link to this page
Your browser does not support the video tag.