10 <br />Other Approvals necessary for the Utility Location Project. The Utility shall abide by these <br />approvals, as required, throughout the completion of the Work. Section 5.07 INITIATION OF WORK. The Utility shall deliver Released for Construction Documents to the Metro Flood Diversion Authority for the Utility Location Project once the Metro Flood Diversion Authority has reviewed and concurred with the Construction Documents Submittal. Along with the Released for Construction Documents, the Utility shall provide written confirmation of compliance with the following requirements to the Metro Flood Diversion Authority: <br /> (a) Review comments are incorporated and comment responses are resolved, responded to, and documented. <br /> <br />(b) No Design Exceptions or deviations from this Agreement exist that have not been accepted by the Metro Flood Diversion Authority. <br /> <br />(c) Construction Documents Submittal complies with this Agreement. <br /> <br /> Section 5.08 ADJUSTMENTS TO THE DCAI. Should the planned route of the DCAI change prior to January 31, 2018, the Utility and Metro Flood Diversion Authority shall <br />immediately interface to adjust plans for the Utility Location Project as necessary. <br /> Section 5.09 ADJUSTMENT TO THE UTILITY ADJUSTMENT WORK. Any changes or modifications to the Released for Construction Documents during construction that materially affect the performance or construction of the Work will be subject to written approval by the <br />Metro Flood Diversion Authority. The Utility will submit the proposed changes or <br />modifications to the Metro Flood Diversion Authority. The Metro Flood Diversion Authority will provide approval or a written explanation of its specific objections to the changes or modifications within twenty (20) Business Days of receipt of the proposed changes or modifications by the Utility <br /> <br />Section 5.10 INSPECTION. The Utility shall be responsible for inspection of all Work; however, the Metro Flood Diversion Authority shall also have the right to inspect any Work on the Utility Location Project that is located within the Project Site or any Work on the Utility Location Project that is located outside of the Project Site to the extent inspection is necessary to confirm conformance with the technical requirements provided in Section 5.02. <br /> <br />Section 5.11 SUBSTANTIAL COMPLETION. The Utility will provide the Metro Flood Diversion Authority with written notice of the anticipated Substantial Completion at least sixty (60) calendar days and fifteen (15) Business Days prior to the anticipated date for Substantial Completion. Within ten (10) Business Days of the anticipated date for Substantial Completion, the Utility and the Metro Flood Diversion Authority will conduct a final <br />inspection of the Work to determine whether the Work meets the Released for Construction Documents and any material changes or modifications made per Section 5.08. If the Metro Flood Diversion Authority finds the construction is not in conformance with the Released for Construction Documents or any approved material changes or modifications, the Metro Flood